Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training

DEVELOP menyelenggarakan Kelas Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training yang akan melatih peserta untuk melaksanakan Pre-Comissioning serta Commissioning untuk kebutuhan pekerjaan proyek Geothermal / PLTP Pembangkit Listrik Panas Bumi.

Pelatihan Komisioning PLTP dari DEVELOP Training Center mencakup verifikasi sistem, pengujian peralatan, aspek keselamatan, keandalan operasi, serta kesiapan plant agar dapat beroperasi secara aman, efisien, dan sesuai standar industri.

Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training
Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training

Setelah mengikuti pelatihan ini, peserta diharapkan mampu:

  • Memahami konsep dan tahapan precommissioning, commissioning, hingga plant ready for start-up PLTP
  • Melakukan verifikasi kesiapan sistem dan peralatan sesuai prosedur dan standar
  • Mengidentifikasi serta menangani potensi masalah teknis selama proses komisioning
  • Menerapkan aspek K3 dan manajemen risiko dalam setiap tahapan kegiatan
  • Mendukung kesiapan PLTP agar dapat beroperasi secara aman, andal, dan efisien

Pembahasan materi mengetengahkan contoh-contoh latihan dalam konteks dunia proyek konstruksi sehingga lebih familier dengan aktivitas proyek sehari-hari.

Pelatihan ini cocok diikuti oleh:

  • Engineer dan teknisi PLTP (mekanikal, elektrikal, instrumen)
  • Tim commissioning dan operasi pembangkit
  • Supervisor, project engineer, dan site manager
  • Personel O&M yang terlibat dalam start-up plant
  • Profesional energi panas bumi yang ingin meningkatkan kompetensi komisioning PLTP

DEVELOP menerapkan Silabus Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training dengan tahapan-tahapan pembelajaran berkualitas sbb :

Sesi 1-2

Focus:

  • Introduction to geothermal power plant
    • Basic geothermal energy concepts
    • Geothermal power generation cycle
    • Main components of geothermal power plant
  • Precommissioning of geothermal power plant
    • Preparation of documents and procedures
    • Mechanical completion and system handover
    • Inspection of static and rotating equipment
    • Flushing cleaning and pressure testing
  • Commissioning of geothermal power plant
    • Commissioning stages and sequence
    • Interlock and logic control verification
    • Cold commissioning and hot commissioning
    • Coordination between disciplines
  • Supporting systems and safety
    • HSE implementation during commissioning
    • Permit to work and lock out tag out
    • Risk management and emergency response

Sesi 3-4

Focus:

  • Mechanical systems of geothermal power plant
    • Steam gathering system
    • Turbine and auxiliary systems
    • Cooling system and condenser
  • Electrical and instrumentation systems
    • Generator and transformer
    • Protection and relay systems
    • Control system DCS and field instruments
  • Plant ready for start up
    • Plant readiness criteria
    • Checklist and acceptance testing
    • Performance readiness Performance Test
Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training
Geothermal Precommissioning, Commissioning & Plant Ready for Start-up (Komisioning PLTP) Training

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge  mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.