Project Risk Management memegang peran penting di perlukan karena :

  • Terdapat hal-hal tak terduga yang muncul saat pelaksanaan proyek, tidak masuk dalam schedule tapi memiliki impact/pengaruh terhadap kemajuan jadwal proyek
  • Pada pelaksanaan Project sering ditemukan Perkiraan Resiko/Risk Process belum quantitative (contoh : terukur akibatnya/Impact Measure,Durasi Kemungkinan terjadi/Probability Duration,Faktor PredecessorSuccessor, top risk ranking),sehingga Perkiraan Resiko akan lebih konkret.
  • Terdapat Uncertain Spending/hal-hal tidak masuk dalam master plan project yang muncul saat pelaksanaan proyek, yang dapat mempengaruhi kondisi financial Perusahaan.

DEVELOP menyelenggarakan Training Project Planning,SchedulingMontecarlo Risk Analysis for Uncertainty Risk Potential with Primavera yang akan melatih Anda bagaimana memanfaatkan Primavera 6 untuk berbagai kebutuhan pengelolaan proyek mulai dari :

  • Membuat dan mendefinisikan Organization Breakdown Structure/OBS serta Work Breakdown Structure/WBS dalam pelaksanaan project
  • Menyusun Schema Project Plan/Rencana Kerja project
  • Melakukan Pengalokasian Project Resource (Manpower, alat berat sarana pendukung proyek lainnya)
  • Assessment Mitigasi Resiko Project
  • Mengukur Uncertainty/Ketidakpastian yang ada pada project
  • Menyusun Strategi Response Plan Action untuk meminimalisir resiko
  • Pemantauan Resiko Quantitative Proyek
  • Membuat dan Menyajikan Laporan Tindak Lanjut Resiko Proyek
  • Memperkuat Accounting Department untuk memprediksi future risks yang dapat mempengaruhi kondisi financial Perusahaan.

Pembahasan materi mengetengahkan contoh-contoh latihan dalam konteks dunia proyek sehingga lebih familier dengan aktivitas proyek sehari-hari.

DEVELOP menyusunmenerapkan Silabus Workshop Project Planning,SchedulingRisk Analysis for Uncertainty Risk Potential With Primavera dengan tahapan-tahapan pembelajaran berkualitas sbb :

Sesi 1

Practical Understanding on Project Planning/Project Monitoring,Primavera IntroductionProject Schedule Development (with Case Study)

Skill Focus:

  • Introduction
    • Introduction to the Project Management
    • Primavera Scope Overview
  • Layout Tool Bar Overview
    • Create Open New Project
    • Display Navigation Bar Project Group Name
    • Custom Display Timescale
    • Custom Display Start day of Week.
    • Custom Display Columns
    • Create Calendar Global Calendar Activity
    • Create Display Time Period
  • Project Schedule
    • Create Project WBS, Display Custom WBS Chart
    • Create Activity Duration
    • Network Plan Overview use Critical Path Method (CPM)
    • Assign Relationship
    • Display Network Plan Trace Logic
    • Project Schedule by Tools Automatically
    • Critical Task Path Analysis
    • Activity Analysis Adjustment
    • Applying Lag Assign Constraint
    • Create Project Baseline Display Baseline Bar
    • Adjust Project Current to Project Baseline
    • Update Progress Plan Actual (Without Resource)
    • Display Adjust Progress Bar (Without Resource)

Sesi 2

Project Baseline,Schedule Control,Project LayoutsReports

Skill Focus:

  • Project Schedule overview
  • Resource Assignment Analysis
    • Open Resource Database Default
    • Create Resource Breakdown Structure
    • Creating Currency Unit of Measure
    • Create Resource Calendar
    • Assign Resource to Activity
    • Display Resource Table, Resource Diagram (Histogram) Resource Graph (Curve)
    • Resource / Cost Usage Analysis
    • Custom and Applying Resource Graphic (Curve)
  • Project Cost Control
    • Update Progress Plan (with Resource)
    • Duration Type Overview (Fix Duration Fix Unit) Select
    • % Percent Complete Type Overview (Duration/Unit/Physical) Select
  • Update Progress Actual (with Resource)
    • Custom Actual Unit % Complete
    • Custom Display Earn Value Analysis (PVC, AC, EVC, CV, CPI, SPI)
  • Print Preview Report Management
    • Creating Select Activity Code
    • Custom Group Sort Activity
    • Creating Custom Print Preview
    • Creating Custom Report
  • Creating Custom Project Tools
  • Create Enterprise Project Structure (EPS) Organization Breakdown Structure (OBS)
  • Create User Defined Fields
  • Creating Select Filter
  • Creating Global Change
    • Applying Unit of Time
    • Applying Duration of Time
    • Importing Exporting File to Primavera
    • Importing Exporting File to MS-Project

Sesi 3

Risk Analysis Overview, MONTE CARLO Analysis, Schedule Review, Risk RegisterQuantifying/Qualifying Risks

Skill Focus:

  • Risk Concept
    • Why How to Conduct Risk Analysis
    • Risk Theory
    • Risk Analysis Flow Chart
    • Risk Model
    • Analyze Overview
    • Mitigate Report
  • Setting Risk
  • Risk Data
    • Calculate Risk Percentile
    • Uncertainty : Internal Activity Resource
    • Risk Event : External
    • Baseline Deterministic – Initial Plan (Original Plan)
    • Baseline Probabilistic – Initial Plan + Risk
  • Monte Carlo Simulation
    • Total Error
    • Deviasi Standar
    • Random Variable Dari Biaya Total
    • Grafik Probability Distribution Function
    • Cumulative Distribution Function
  • ScheduleDURATION
    • Plan Information
    • Task Custom Duration
    • Webs
    • Task Successors
    • Plan – Baseline
  • Schedule Review (Control Baseline)
    • Check List / Rationale
    • Schedule Check Report
    • Open Ended Task
    • Start Finish Milestone
  • Duration Quick Risk
    • Duration Quick Risk
    • Risk Formula Detail
    • Process By Monte Carlo Simulation With Iteration
    • Risk Distribution Graph
  • Template Quick Risk
    • Task Existence
    • Total Duration Has Change After Link Assignment Task Existence
    • Apply Template Quick Risk To Schedule
    • Run Risk Analysis
    • Risk Distribution Graph
    • Custom Risk Per Activity
    • Risk Level Untuk Qualitative Uncertainty
    • Risk Distribution Graph
  • Risk Register (Qualitative Quantitative Analysis)
    • Pre Mitigated (Probabilistic/Schedule/Cost/Performance)
    • Mitigated (Response/Title/Total Cost)
    • Build Impacted Risk Plan
    • Pre-Mitigated
    • Expand Task
    • Risk Scoring
    • Customized Risk Scoring
    • Quantitative : Assign Risk Register To Task
    • Build Impacted Risk Plan
    • Pre Mitigated
    • Risk Distribution Graph
  • Case Study 1 Risk Analysis Customized to match with Project/Operation goals
    • Baseline Deterministic
    • Risk Event Uncertainty
    • Baseline Probabilistic
    • Duration Quick Risk
    • Template Quick Risk
    • Task Existence
  • Risk Event For Weather Modeling
    • Assign Resource To Task
    • Plan – Resource Quick Risk
    • Weather Events
    • Identifikasi Resiko Terhadap Schedule
    • Tornado Graph
  • Resource Cost Uncertainty
  • Analyze Mitigate
  • Display Risk Output
  • QA checksFinal Risk Analysis Report
  • Case Study (Risk Analysis Customized to match with Project/Operation goals)
    • Weather Modeling
    • Risk Register (Qualitative AnalysisQuantitative Analysis)
    • Qualitative Analysis
      • Terhadap Schedule Cost
      • Data Resiko Dampak Resiko
      • Deterministic Baseline
      • Distribusi Peluang (Probabilistic)
      • Peluang Pencapaian
      • Mitigation Plan
    • Quantitative Analysis
      • Terhadap Risk Uncertainty
      • Risk Event Uncertainty
      • Feasible Realistis

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.