Powerplant Precommissioning,Commissioning&Plant Ready for Start-up Training

DEVELOP menyelenggarakan Training POWERPLANT Precommissioning,CommissioningPlant Ready for Start-up yang akan melatih Anda bagaimana melaksanakan Pre-Comissioning serta Commissioning untuk berbagai pekerjaan proyek Pembangkit Listrik/Power Plant seperti:

  • Pembangkit Listrik Tenaga Uap (PLTU)
  • Pembangkit listrik tenaga nuklir (PLTN)
  • Pembangkit Listrik Tenaga Air (PLTA)
  • Pembangkit Listrik Tenaga Surya (PLTS)
  • Pembangkit Listrik Tenaga Sampah (PLTSa)
  • dll

Pembahasan materi mengetengahkan contoh-contoh latihan dalam konteks dunia proyek konstruksi sehingga lebih familier dengan aktivitas proyek sehari-hari.

Training ini cocok untuk diikuti oleh para Commissioning Technician, Supervisor, Engineer, Superintendent, Coordinator, Client Production Operator.

Training ini akan mengajarkan kepada Anda untuk menguasai skill penting seorang Power Plant Project Precommissioning, Commissioning Start-up Engineer diantaranya :

  • Memahami aktifitas proyek dalam tahap Power Plant Precommissioning, Commissioning dan Startup
  • Dapat membuat System/Sub System, Markup Drawing, Deliverable List untuk Power Plant Commissioning
  • Peserta dapat memahami aktifitas Pre Commissioning Mechanical, Piping,Electrical dan Instrument Power Plant
  • Dapat menyusun urutan/sequence pengerjaan Power Plant Commissioning dan Startup

DEVELOP menerapkan Silabus Training Power Plant Precommissioning,CommissioningPlant Ready for Start-up dengan tahapan-tahapan pembelajaran berkualitas sbb :

Sesi 1-2 Power Plant Pre-CommissioningCommissioning Overview, Deliverables List,Sub-System Identification and Operation Test

  • Power Plant Project Phase,Pre-Commissioning Commissioning Overview
  • Power Plant Project Organization and Discipline in Commissioning
  • Power Plant Commissioning Deliverables List Sub-System Identification
  • Power Plant System Markup Drawing: PID, Instrument Control and Single Line Diagram
  • Power Plant General Procedure and Operation Test
  • Power Plant Commissioning Plan,StrategyAcceptance Step
  • Power Plant Mechanical CompletionPunch List

Sesi 3-4 Power Plant Workpack Execution, Spare part-Tools,Performance Test, Commissioning Quality Assurance Final InspectionPower Plant Ready for Start-Up

  • Power Plant Workpack Execution Plan, Schedule, Manpower Loading
  • Power Plant Equipment List, Cable List, Line List, Test Package
  • Check sheet/Test sheet Matrix Power Plant
  • Power Plant Spare part, Temporary Equipment Tools
  • Power Plant Commissioning System Database Dossier
  • Power Plant Commissioning Startup Sequence Performance Test
  • Power Plant Commissioning Quality Assurance Final Inspection Recheck
  • Plant Ready for Start-up

Materi Training dirancang khusus oleh para praktisi Power Plant Comissioning Engineers sesuai dengan experience dan solid knowledge mereka dalam menangani project. Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek Power Plant nyata.

Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

QUICK REGISTER :

* Required

Tags: , , , , , , , , , ,



error: Content is protected !!
WhatsApp How can we help you today?