NFPA 20 Stationary Pumps for Fire Protection Installation Training

DEVELOP Training Center menyelenggarakan Kelas NFPA 20 Stationary Pumps for Fire Protection Installation Training yang sangat berguna untuk mendapatkan pengetahuan tentang tentang instalasi, pengoperasian, dan pemeliharaan sistem pompa kebakaran sesuai dengan standar NFPA 20.

Pelatihan ini mencakup teori dasar, prosedur instalasi dalam memastikan sistem pompa berfungsi dengan optimal untuk perlindungan kebakaran.

Materi Training di DEVELOP Training Center dirancang khusus oleh para praktisi designer & engineer sesuai dengan kebutuhan project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman.

NFPA 20 Stationary Pumps for Fire Protection Installation Training

NFPA 20 Stationary Pumps for Fire Protection Installation Training

DEVELOP mengimplementasikan Syllabus Kelas NFPA 20 Stationary Pumps for Fire Protection Installation / Pemasangan Pompa Stasioner NFPA 20 untuk Perlindungan Kebakaran dengan tahap-tahap pembelajaran berkualitas sbb :

Sesi 1-2

Skill Focus:

  • NFPA 20 Standards & Fire Protection Systems Overview
    • NFPA 20 Standards Fundamentals
    • Fire pumps & water supply storage tanks for fire protection systems
    • Pressure, flow & duration
  • Stationary Pumps Components
    • Pumps Types (Diesel, electric & jockey pumps)
    • Pumps Components
    • Pump, motor (prime mover), impeller & diffuser
    • discharge head, suction header & control panel
  • Pump Sizing & Selection
    • Calculating required flow (GPM) & discharge pressure
    • Sizing formulas, system characteristics & hydraulic calculations
    • Pumps efficiency, safety margins & redundancy
  • Installation Requirements
    • Proper foundation design, alignment & pump mounting
    • Correct pipe sizing, materials & installation of suction & discharge piping
    • Valve selection & proper placement (check, isolation, pressure relief valves)
  • Piping System, Valves & Controls
    • Sizing & layout of piping systems for balanced water distribution
    • Control systems for monitoring pressure, flow & alarms
  • Case Study

Sesi 3-4

Skill Focus:

  • Pump Installation
    • Assembly, mounting & alignment of pumps
    • Pipe & valve installation with focus on leak prevention
    • Basic pump testing to verify pressure settings & flow rates
  • Electrical Connections & Wiring for Fire Pumps
    • Power supply requirements (electric vs diesel)
    • Proper motor connection, grounding & circuit protection
    • Wiring of control panels, alarms & safety interlocks
  • Testing & Commissioning of Fire Protection Pumps
    • Performance tests: flow, shutoff head & system start-up
    • Commissioning to verify system integrity & calibration of sensors
    • Safety during high-pressure testing
  • Case Study

NFPA 20 Stationary Pumps for Fire Protection Installation Training

NFPA 20 Stationary Pumps for Fire Protection Installation Training

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge  mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.

QUICK REGISTER :

* Required

Tags: , , , , , , , , , , , ,



error: Content is protected !!
WhatsApp How can we help you today?