Well Completion&Workover Operations for Optimal Wells Productivity Training
Well Completion dan workover sumur minyak dan gas mengacu pada proses dan operasi yang dilakukan pada sumur minyak atau gas setelah pengeboran untuk persiapan produksi minyak gas.
Secara keseluruhan, Operasi Well Completion dan workover memainkan peran penting dalam mengoptimalkan produksi sumur minyak dan gas.
DEVELOP menyelenggarakan Pelatihan Well Completion and Workover Operations for Well Productivity Optimization Training yang akan melatih Anda tentang Teknik Produksi Migas diantaranya:
- Oil Gas Production Casing Installation&Tubing Installation
- Completion Process&Christmas Tree Installation
- Well Completion Selection
- Completion,Workover Fluids&Packer Fluids
- Perforation&Perforating Fluid
- Wellhead Assembly&Well Stimulation
- Acidizing&Fracturing
- Well Productivity Optimization Case Study
Pembahasan materi mengetengahkan contoh-contoh latihan dalam konteks dunia proyek sehingga lebih familier dengan aktivitas proyek sehari-hari.
Well Completion&Workover Operations for Optimal Wells Productivity Training
DEVELOP menerapkan Silabus Well Completion and Workover Operations for Well Productivity Optimization Training dengan tahapan-tahapan pembelajaran berkualitas sbb :
Sesi 1-2
Skill Focus:
- Well Completion Overview
- Applicable Standards&Codes
- Nodes in Production System
- Separator
- Well Head
- Safety Valve
- Stock Tank
- Gas Sales
- Condution Pipe
- Surface Casing
- Oil Reservoir
- Tubing
- Packer
- Perforation
- Casing Shoe
- Setting Production Casing
- Oil Gas Production Casing Installation
- Conductor Pipe
- Surface Casing
- Intermediate Casing
- Production Casing
- Perforated Interval
- Tubing Installation
- Completion Process
- Christmas Tree Installation
- Well Completions Types
- Open Hole Completions
- Liner Completions
- Screen Liner completion
- Perforated Liner Completion
- Perforated Casing completions
- Tubingless or Reduced Diameter Completions
- Well Completion Selection
- Casing Flow
- Tubing Andannulus Flow
- Tubing Flow
- Well Completion/Well Productivity Optimization Case Study
Sesi 3-4
Skill Focus:
- Type of Flow
- Single Tubing Completion
- Single string sequential completions
- Single string commingle completions
- Single string selective zone completion
- Dual Completion
- Triple Completion
- Horizontal Completion
- Multilateral Completion
- Completion and Workover Fluids
- Packer Fluids
- Perforation
- Perforating Fluid
- Wellhead Assembly
- Well Stimulation
- Acidizing
- Fracturing
- Well Completion/Well Productivity Optimization Case Study
Well Completion&Workover Operations for Optimal Wells Productivity Training
Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.
Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.
QUICK REGISTER :
Tags: Acidizing, Applicable Standards-Codes, Bimtek Well Completion-Workover-Optimal Productivity, Casing Flow, Casing Shoe, centre drill Well Completion-Workover-Optimal Productivity, Christmas Tree Installation, Completion and Workover Fluids, Completion Process, Conductor Pipe, Condution Pipe, develop training, Dual Completion, Fracturing, Gas Sales, Horizontal Completion, Intermediate Casing, Jadwal Pelatihan Well Completion-Workover-Optimal Productivity, jadwal training jakarta Well Completion-Workover-Optimal Productivity, kursus privat Well Completion-Workover-Optimal Productivity, Liner Completions, Multilateral Completion, Nodes in Production System, Oil Gas Production Casing Installation, Oil Reservoir, Open Hole Completions, Packer, Packer Fluids, Pelatihan Well Completion-Workover-Optimal Productivity, Perforated Casing completions, Perforated Interval, Perforated Liner Completion, Perforating Fluid, Perforation, PPI Program Profesi Insinyur Well Completion-Workover-Optimal Productivity, Production Casing, Pusat Pelatihan Well Completion-Workover-Optimal Productivity, Regional Model Competency Standard RMCS Well Completion-Workover-Optimal Productivity, Safety Valve, Screen Liner completion, Seminar Well Completion-Workover-Optimal Productivity, Separator, Setting Production Casing, Single string commingle completions, Single string selective zone completion, Single string sequential completions, Single Tubing Completion, Stock Tank, Surface Casing, Training Analis Proses Well Completion-Workover-Optimal Productivity, Training Commissioning Engineer Well Completion-Workover-Optimal Productivity, Training Commissioning Manager Well Completion-Workover-Optimal Productivity, Training Construction Manager Well Completion-Workover-Optimal Productivity, Training Construction-Fabrication Manager Well Completion-Workover-Optimal Productivity, Training Cost Control Well Completion-Workover-Optimal Productivity, Training Engineering Manager Well Completion-Workover-Optimal Productivity, Training HSE Coordinator Well Completion-Workover-Optimal Productivity, Training HSE Manager Well Completion-Workover-Optimal Productivity, Training HSE Officer Well Completion-Workover-Optimal Productivity, Training Installation Manager Well Completion-Workover-Optimal Productivity, Training Installation Well Completion-Workover-Optimal Productivity, Training Interface Manager Well Completion-Workover-Optimal Productivity, Training Kontraktor Well Completion-Workover-Optimal Productivity, Training Operation Assurance Manager Well Completion-Workover-Optimal Productivity, Training Operations Assurance Manager Well Completion-Workover-Optimal Productivity, Training Planner Scheduler Well Completion-Workover-Optimal Productivity, Training Project Control Manager Well Completion-Workover-Optimal Productivity, Training Project Control-Services Manager Well Completion-Workover-Optimal Productivity, Training Project Coordinator Well Completion-Workover-Optimal Productivity, Training Project Engineer Well Completion-Workover-Optimal Productivity, Training Project Manager Well Completion-Workover-Optimal Productivity, Training Project Owner-Client Well Completion-Workover-Optimal Productivity, Training QA-QC Manager Well Completion-Workover-Optimal Productivity, Training QA-QC Pengawas-QC pemeriksa kualitas Well Completion-Workover-Optimal Productivity, Training QC Inspector Well Completion-Workover-Optimal Productivity, Training Site Engineer Well Completion-Workover-Optimal Productivity, Training Site Planner Well Completion-Workover-Optimal Productivity, Training Supervisor-Superintendent Well Completion-Workover-Optimal Productivity, Training Supervisors civil Well Completion-Workover-Optimal Productivity, Training Supervisors electrical Well Completion-Workover-Optimal Productivity, Training Supervisors instrument Well Completion-Workover-Optimal Productivity, Training Supervisors mechanical Well Completion-Workover-Optimal Productivity, Training Supervisors painting Well Completion-Workover-Optimal Productivity, Training Supervisors piping Well Completion-Workover-Optimal Productivity, Training Supervisors welding Well Completion-Workover-Optimal Productivity, Training Well Completion-Workover-Optimal Productivity, Triple Completion, Tubing, Tubing Andannulus Flow, Tubing Flow, Tubing Installation, Tubingless or Reduced Diameter Completions, Type of Flow, Webinar Zoom Well Completion-Workover-Optimal Productivity, Well Completion Overview, Well Completion Selection, Well Completion-Well Productivity Optimization Case Study, Well Completions Types, Well Head, Well Stimulation, Wellhead Assembly, Workshop Well Completion-Workover-Optimal Productivity