Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop

DEVELOP Training Center menyelenggarakan Kelas Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop yang akan mengajarkan kepada Anda tentang program inspeksi berbasiskan risiko (risk based inspection).

Pembahasan akan dimulai pengertian dan scope RBI, terminologi-terminologi yang terkait dengan bahaya dan risiko, hierarchy of hazard control serta overview pada RBI Code & Standard (API 580 & API 581) beserta optimalisasi penerapannya.

Metode analisis RBI yang akan dibahas dalam pelatihan ini meliputi semua level yaitu:

  1. Level 1 (qualitative), Level 2 (semi-quantitative) dan Level 3 (full-quantitative)
  2. Hal-hal detil yang diperlukan dalam analisis RBI seperti penentuan likelihood & consequence of failure,properties of fluids
  3. Penentuan program rencana inspeksi (inspection plan) untuk fasilitas, equipment berdasarkan analisis level risiko.

Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop

Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop

DEVELOP menerapkan Syllabus Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop dengan tahap-tahap pembelajaran berkualitas sbb :

Sesi 1-2

Skill Focus:

  • Risk Based Inspection Fundamentals
  • Applicable Risk Based Inspection/RBI Standards&Codes
    • API 580 Risk Based Inspection
    • Purpose of API 580
    • Equipment Covered in API RP 580
    • API 581
  • Risk Based Inspection/RBI Program Key Elements
  • Risk Based Inspection/RBI as Integrated Management& Continuous Improvement Tool
  • Risk Based Inspection/RBI Scope
  • Industry scope&Flexibility in Application
  • Mechanical Integrity (Pressure Vessels&Heat exchangers, Rotating Equipment,Boilers and heaters Storage tanks)
    • Process Piping Integrity
    • Pressure Relief Devices
    • Equipment Not Covered
    • Instrument and control systems,Electrical Systems,Structural Systems&Machinery Components
  • Absolute Risk&ALARP (As Low As Reasonably Practical)
  • Consequence,Damage Tolerance&Deterioration
    • Event Tree,External Event&Failure Mode
    • Hazard Mitigation&Probability
  • Qualitative&Quantitative Risk Analysis (Assessment)
  • RISK MANAGEMENT AND RISK REDUCTION
    • Risk Assessment&Risk Acceptance
    • Risk Control&Risk Reduction
    • Advancement Of Inspection Intervals
    • Inspection Optimization
    • Risk Plot
  • Types Of RBI Assessment
  • Qualitative,Quantitative Approach&Semi Quantitative Approach
  • Continuum of RBI Approaches
  • Risk-based Inspection Planning Process
  • Consequence of failure/COF&Probability of failure/POF
  • MANAGE OPERATING RISKS
  • PLANNING THE RBI ASSESSMENT
  • Facilities Screening
    • Oil and gas production facilities
    • Oil and gas processing and transportation terminals
    • Refineries
    • Petrochemical and chemical plants
    • Pipelines and pipeline stations
    • LNG plants
  • Process Units Screening
    • Turnaround schedule
    • Equipment Item Screening
  • OPERATING BOUNDARIES
  • ESTIMATING RESOURCES AND TIME REQUIRED
  • Risk Based Inspection/RBI Case Study

Sesi 3-4

Skill Focus:

  • RBI Data&Analysis
  • DATA QUALITY
  • FAILURE AND FAILURE MODES FOR RISK BASED INSPECTION
  • DETERIORATION MECHANISMS
    • Thinning (includes internal and external)
    • Stress corrosion cracking
    • Metallurgical and environmental
    • Mechanical
  • OTHER FAILURES
  • PROBABILITY ANALYSIS
    • ASSESSING PROBABILITY OF FAILURE
    • Qualitative Probability of Failure Analysis
    • Quantitative Probability of Failure Analysis
    • Determine Failure Mode
    • Quantify Effectiveness of Past Inspection
    • Calculate the Probability of Failure by Deterioration Type
    • Assessing Consequences of Failure
    • Loss of Containment
    • Affected Area
    • Environmental Damage
  • VOLUME OF FLUID RELEASED
    • Flammable Events (Fire and Explosion)
    • Toxic Releases
    • Environmental Cost
    • Business Interruption
    • Downtime
    • Maintenance and Reconstruction
  • RISK MANAGEMENT DECISIONS AND ACCEPTABLE LEVELS OF RISK
    • Sensitivity Analysis
    • Risk Presentation
    • Risk Matrix
    • Numeric Risk Values
    • Acceptable Risk Thresholds
    • Managing Risk By Reducing Uncertaintythroughinspection
    • Risk Driver
    • Inspection Opportunities Through Pof
    • Risk Management With Inspection
  • INSPECTION COSTS WITH RBI
  • LOWEST LIFE CYCLE COSTS WITH RBI
  • RBI REASSESSMENTS
    • Before and After Maintenance Turnarounds
    • Risk Assessment Personnel
    • Environmental and Safety Personnel
    • Financial / Business Personnel
    • Time Frame
  • Risk Based Inspection/RBI Case Study

Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop

Risk Based Inspection/RBI Implementation for Plant Reliability&Safety Operation Workshop

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge  mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.

QUICK REGISTER :