QAQC Project Control for Marine Infrastructure Projects Training

DEVELOP Training Center menyelenggarakan Kelas QAQC Project Control for Marine Infrastructure Projects Training yang sangat berguna untuk mendapatkan skill tentang :

  • QAQC Proyek untuk proyek Proyek Infrastruktur Kelautan (Marine Infrastructure)
  • Pengalaman praktis tentang bagaimana mengelola Proyek Infrastruktur Kelautan
  • QAQC Pelaksanaaan phase engineering, procurement, construction, commissioning and hand-over untuk Proyek Infrastruktur Kelautan
  • Mengetahui problem solving dalam mengelola Proyek Infrastruktur Kelautan (Marine Infrastructure)

 

QAQC Project Control for Marine Infrastructure Projects Training

QAQC Project Control for Marine Infrastructure Projects Training

DEVELOP mengimplementasikan Syllabus QAQC Project Control for Marine Infrastructure Projects Training dengan tahap-tahap pembelajaran berkualitas sbb :

Sesi 1-2 Pengenalan Obyek Kontrak, Tahapan Pelaksanaan Proyek &Project Management Proyek Infrastruktur Kelautan (Marine Infrastructure)

Skill Focus :

  • Project Management Team Activities
    • Key Personnel as per bid proposal
    • Kualifikasi Personil as per bid proposal
    • Proses perekrutan personil
    • PEP (Project Execution Plan) & Controlling Cost (Contract, contingency, buyout, vs actual)
  • Project Management Team
    • Project Sponsor,Project Director&Project Manager
    • Engineering Manager,Procurement Manager&Construction Managers
    • Precomm/comm manager
    • QA/QC Manager&HSE Manager
    • Project Control /Cost Control Manager
    • Document control
  • DETAILED ENGINEERING
    • Engineering Deliverables
    • Finalized the philosophy (control, fire, operation)
    • PID, PFD, Plot plan, Equipment List and data sheet
    • Piling plan dwg,Building Drawing,line list,Piping plan
    • Control Engineering Quality
  • PROCUREMENT
    • Membuat master list
    • RFQ, PO (material package, subcont)
    • PMS (Procurement Master Schedule)
    • Inspeksi&Test Witnessing
    • Handover material/barang/spare/special tools ke Material control
    • Emergency materials
  • Case Study

 

Sesi 3-4 Schedule&Risk Control Proyek Infrastruktur Kelautan (Marine Infrastructure)

Skill Focus :

  • SCHEDULE,COST&RISK CONTROL
    • Perencanaan, penjadwalan (scheduling)
    • alokasi sumber daya
    • Mengukur kemajuan proyek dan pelaporannya (S-Curve)
    • Project Control/Services (Weight Factor,Milestone & Progress Measurement,(see JTB)
    • Overall Progress “S” Curve
    • 90 DAYS SCHEDULE/90 days target schedule
    • Cost control/Cash Flow Prediction
  • Risk Analysis Overview& Scope in Projects-Plant Operation
    • Risk Analysis Flow Chart
    • Task Durations Model
    • Uncertainty & Task Existence Risk
    • Schedule Review/resource loaded schedule
    • Task on critical path
  • Risk Ready State
    • Review for logic & errors
    • Risk Identification
    • Estimate Uncertainty
    • Risk Events: Risk Register
    • Quantify the Risks
    • Develop Risk Model
    • Map Risks to Activities
    • Risk Schedule Deviation from target
  • Probabilistic Risk
    • Preliminary Analysis & Review
    • Risk Event plan
    • Impacted Risk Plan
    • Risk Analysis Outputs
    • Tasks COST&uncertainty Risk Potential
    • Develop Mitigation Strategies&Planning
    • Case Study

QAQC Project Control for Marine Infrastructure Projects Training

QAQC Project Control for Marine Infrastructure Projects Training

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge  mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.

QUICK REGISTER :

* Required

 



error: Content is protected !!
WhatsApp How can we help you today?