Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop

DEVELOP Training Center menyelenggarakan Training Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop yang sangat berguna untuk mendapatkan skill tentang :

  • Partial Discharge (PD) Fundamentals
  • Equipment Criticality Assessment
  • High Voltage Power Failure Rate Avoidance
  • Partial Discharge (PD) Detection
  • Stator winding insulation systems
  • Analisa data mekanisme kegagalan peralatan untuk Perencanaan pemeliharaan&optimasi

Materi Training di DEVELOP Training Center dirancang khusus oleh para praktisi designer & engineer sesuai dengan kebutuhan project.

Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop

Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop

Partial Discharge (PD), adalah pelepasan listrik yang terjadi di sebagian isolasi antara dua elektroda konduktor, tanpa menjembatani celah sepenuhnya. PD disebabkan ketika ada diskontinuitas dalam sistem insulasi dan sebagai ‘aturan umum’.

PD akan terjadi pada sistem yang beroperasi pada tegangan 3000V ke atas (walaupun perlu dicatat bahwa PD dapat terjadi pada tegangan yang lebih rendah dari ini). Pelepasan sebagian dapat terjadi di rongga dalam insulasi padat (kertas, polimer, dll), di sepanjang antarmuka sistem insulasi padat berlapis banyak, dalam gelembung gas dalam insulasi cair, atau di sekitar elektroda dalam gas (pelepasan Corona).

Aktivitas Partial Discharge dapat dimulai dalam kondisi kerja normal pada peralatan tegangan tinggi di mana kondisi insulasi telah memburuk karena usia, atau telah menua sebelum waktunya karena tekanan panas berlebih/over thermal atau karena pemasangan yang tidak tepat.

PD sering dapat di temui pada fasa komisioning peralatan baru karena pemasangan yang tidak tepat, desain dan/atau pengerjaan yang buruk (terutama pada sambungan kabel dan terminasi).

DEVELOP mengimplementasikan Syllabus Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop dengan tahap-tahap pembelajaran berkualitas sbb :

 

Sesi 1-2

Skill Focus:

  • Partial Discharge Overview
  • Applicable Standards&Codesa
  • Corona
  • Surface Tracking
  • Voltage Stress
  • Sensing Partial
  • Discharge
  • Component Failure
  • High Voltage Equipment Diagnostics
  • Equipment failure mechanisms
  • Conventional and unconventional test techniques
  • PD Testing Deployment in Asset Management Programs
  • Ageing population problem
  • Plant replacements
  • Avoid unplanned outage
  • Minimize failure rate
  • Partial Discharge Case Study

Sesi 3-4

Skill Focus:

  • Cable terminations & sealing ends/outdoor HV plant Safety
  • Partial Discharge Testing
  • Diagnostics for MV and HV Cables
  • PD Location methods
  • Assessing criticality
  • PD Testing and Diagnostics for MV Switchgear
  • Testing and Diagnostics of Partial Discharge for Motors and Generators
  • Recognising Phase-Resolved PD (PRPD) Patterns
  • Troubleshooting and failure investigations
  • Partial Discharge Case Study

Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop

Partial Discharge,Equipment Criticality Assessment&High Voltage Power Failure Rate Optimation Workshop

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge  mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.

QUICK REGISTER :

* Required

 



error: Content is protected !!
WhatsApp How can we help you today?