FEED&EPC (Front End Engineering Design/Engineering-Procurement-Construction) Project Control Workshop

  • Posted on :
  • PROJECT MANAGEMENT
  • Comments Off on FEED&EPC (Front End Engineering Design/Engineering-Procurement-Construction) Project Control Workshop

DEVELOP Training Center menyelenggarakan Training FEED EPC (Front End Engineering Design/Engineering-Procurement-Construction) Project Control Workshop yang sangat berguna untuk mendapatkan skill tentang :

  • Strategi pengelolaanResolve isu-isu yang ada dalam proyek FEED
  • Pengalaman praktis tentang bagaimana perusahaan jasa konstruksi Engineering-Procurement-Construction/EPC mengelola proyek EPC di Industri Migas
  • Menerapkan manajemen proyek pada proyek EPC
  • Melaksanakan phase EPC: engineering, procurement, construction, commissioning and hand-over
  • Teknik cost estimation dan schedule untuk Tahap EPC
  • Mengetahui problem solving dalam mengelola proyek EPC

DEVELOP mengimplementasikan Syllabus Training FEEDEPC (Front End Engineering Design/Engineering-Procurement-Construction) Project Control Workshop dengan tahap-tahap pembelajaran berkualitas sbb :

Sesi 1 FEED Initiation, PlanningExecution

Skill Focus:

  • FEED Initiation
    • Client Work Order, Client Scope of work, FEED Stakeholder identification, etc.
  • FEED Planning
  • FEED Proposal Preparation
    • FEED Deliverables identification for Process/Piping/Mechanical/Instrumentation/Electrical/Civil Project Support, Man-hour estimation for each discipline, FEED Budget, etc.
  • FEED Execution
    • MDR development for Process/Piping/Mechanical/Instrumentation/Electrical/Civil Project Support, FEED Project Measurement, And FEED Project change order, FEED Review Cycles, etc.

Sesi 2 FEED MonitoringControl, Cost Estimation Output Project Final Close Out

Skill Focus:

  • FEED Monitoring Controlling
    • FEED Progress Cost control, FEED productivity, FEED project update, ect.
  • Cost Estimation and Schedule’s important element for EPC
  • FEED Close Out
    • FEED Lessons Learnt, FEED Close out Report and FEED Deliverables packaging

Sesi 3 Obyek Kontrak EPC,Tahapan Pelaksanaan Proyek EPC,Project Management ,Detailed Engineering,Procurement

Skill Focus :

  • OBYEK KONTRAK EPC
    • ExplorationProduction (EP)
    • Plot Plan (Onshore/Offshore Processing)
  • TAHAPAN PELAKSANAAN PROYEK EPC
    • ITB, ADDENDUM, CLARIFICATION CONTRACT
    • Project Schedule Organization Chart (key persons)
    • EPC Contract Legal aspect (lump sum cost, penalty, change scope, dll)
    • Master Schedule,90 days Schedule,Milestone schedule,Mechanical Completion ScheduleFactory Acceptance schedule
  • Project Management Team Activities
    • Key Personil as per bid proposal
    • Kualifikasi Personil as per bid proposal
    • Proses perekrutan personil
    • KOM (Kick-Off Meeting).Deliverable List,Milestone Baseline Schedule
    • PEP (Project Execution Plan) Controlling Cost (Contract, contingency, buyout, vs actual)
  • EPC Project Management Team
    • Kick-Off Meeting,Participants KOM
    • Project Sponsor,Project DirectorProject Manager
    • Engineering Manager,Procurement ManagerConstruction Managers
    • Precomm/comm manager
    • QA/QC ManagerHSE Manager
    • Project Control /Cost Control Manager
  • DETAILED ENGINEERING
    • Engineering Deliverables
    • Validate FEED (PFD, PID, Sizing, process simulation, Philosophy (control, fire), SLD, material selection, plot plan)
    • Finalized the philosophy (control, fire, operation)
    • Finalized Topography, soil investigation
    • First submission : PID, PFD, Plot plan, Equipment List and data sheet,Piling plan dwg,Building Drawing,line list,Piping plan,U/G Composite drawing,Standard drawing,cable/tray lay out,General Spec ,Safety Review Studies (HAZOPS/HAZID/SIL),Detailed Engineering : Process, Process Safety, Mechanical, Piping, Electrical, Instrumentation, Structural, Piping, Civil, dll,Control Engineering Quality
    • Study Kasus Discussion
  • PROCUREMENT
    • Membuat master list
    • Import/re-export Customs clearance
    • RFQ, PO (material package, subcont),PMS (Procurement Master Schedule) dan FES (Field Expediting Schedule)
    • InspeksiTest Witnessing
    • Handover material/barang/spare/special tools ke Material control (Unpack, inspection, MRR, NCR)
    • PO terhadap emergency material (Field Material Request)

Sesi 4 Construction / Onshore Fabrication Project Control

Skill Focus :

  • CONSTRUCTION / ONSHORE FABRICATION
    • Material Mobilization Plan (as per CRD)
    • Constructability reviews (rigging study, method, tools)
    • Waste Management
    • HSE Emergency Response Management
    • Mechanical Completion
    • Setup Construction (Onshore Fabrication) Team
    • Construction Required Date
    • Temporary Drainage Plan
    • Temporary Facility Utility Required
  • PROJECT CONTROL
    • Perencanaan, penjadwalan (scheduling), dan alokasi sumber daya menggunakan software Mengukur kemajuan proyek dan pelaporannya (S-Curve)
    • Project Control/Services (Weight Factor,Milestone Progress Measurement,(see JTB),Overall Progress “S” Curve,90 DAYS SCHEDULE/ Menampilkan 90 days target schedule Cost control/Cash Flow Prediction)
    • Document control
  • EPC CASE STUDY
  • EPC SAMPLE DATASHEETEPC REPORTS

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.