Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training

DEVELOP menyelenggarakan Training Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training yang akan melatih Anda bagaimana melaksanakan Pre-Comissioning serta Commissioning untuk berbagai kebutuhan pekerjaan proyek konstruksi.

Pembahasan materi mengetengahkan contoh-contoh latihan dalam konteks dunia proyek konstruksi sehingga lebih familier dengan aktivitas proyek sehari-hari.

Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training

Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training

Training ini cocok untuk diikuti oleh para Commissioning Technician, Supervisor, Engineer, Superintendent, Coordinator, Client & Production Operator.

Training ini akan mengajarkan kepada Anda untuk menguasai skill penting seorang Distribution Panel Precommissioning, Commissioning &  Start-up Engineer diantaranya :

  • Memahami aktifitas proyek dalam tahap Precommissioning, Commissioning dan Startup
  • Mampu melakukan persiapan dalam aktifitas Precommissioning dan Commissioning
  • Dapat membuat System/sub System, Markup Drawing, Deliverable List.
  • Peserta dapat memahami aktifitas Pre Commissioning Mechanical, Piping,Electrical dan Instrument
  • Dapat menyusun urutan/sequence pengerjaan Commissioning dan Startup

DEVELOP menerapkan Silabus Training Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training dengan tahapan-tahapan pembelajaran berkualitas sbb :

Sesi 1-2

  • Introduction to Distribution Transformer Commissioning
  • Distribution Transformer Basics
  • Pre-Commissioning Preparations
  • Installation and Assembly
  • Transformer Commissioning Procedure
  • Transformer Commissioning Tests
  • Applicable Standards&Codes
  • winding Resistance Measurement
  • Voltage ratio
  • Vector group/phase displacement
  • Short-Circuit Voltage Impedance
  • Load Loss Measurement
  • No-Load Loss
  • No-Load Current

Sesi 3-4

  • zero-sequence impedance of three-phase transformers
  • Test on on-load tap-changers and auxiliary equipments
  • Insulation Resistance Measurement
  • Dissipation Factor
  • Insulation System Capacitances
  • Bushing Current Transformer/BCT Verification
  • Earth Resistance Measurement
  • Case Study

Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training

Distribution Transformer Precommissioning,Commissioning&Ready for Start-up Training

Materi Training dirancang khusus oleh para praktisi Project Engineers sesuai dengan experience dan solid knowledge  mereka dalam menangani project. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun.

Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata.

QUICK REGISTER :

* Required

 

Tags: ,



error: Content is protected !!
WhatsApp How can we help you today?