{"id":9019,"date":"2019-07-07T21:03:08","date_gmt":"2019-07-07T21:03:08","guid":{"rendered":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/"},"modified":"2026-08-16T07:37:09","modified_gmt":"2026-08-16T07:37:09","slug":"valve-installation-verification-and-commissioning-training","status":"publish","type":"post","link":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/","title":{"rendered":"Valve Installation Verification and Commissioning Training"},"content":{"rendered":"<p>DEVELOP Training Center menyelenggarakan Kelas Valve Installation Verification and Commissioning yang sangat berguna untuk mendapatkan pengetahuan tentang verifikasi instalasi valve, orientation, flow direction, flange dan gasket, actuator, positioner, functional testing, stroke, feedback, leakage, dan commissioning valve. <br \/><\/br> Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur. <br \/><\/br> <center> <img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-22971\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2025\/07\/DV-GEN-039.jpg\" alt=\"Valve Installation Verification and Commissioning\" width=\"284\" height=\"271\"><figcaption> Valve Installation Verification and Commissioning <\/figcaption><\/center> <br \/><\/br> DEVELOP mengimplementasikan Syllabus Kelas Valve Installation Verification and Commissioning dengan tahap pembelajaran berkualitas sebagai berikut:<\/p>\n<blockquote><p><b>Sesi 1-2<\/b><\/p>\n<ul>\n<li>Valve construction and process application requirements<\/li>\n<li>Valve identification, tag numbers, and specifications<\/li>\n<li>Valve orientation, flow direction, and installation checks<\/li>\n<li>Flange, gasket, bolt, and connection inspection<\/li>\n<li>Manual valve operation and stem condition checks<\/li>\n<li>Actuator, positioner, and control valve inspection<\/li>\n<li>Drain, vent, bypass, and associated piping verification<\/li>\n<li>Valve installation records and inspection documentation<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<p><b>Sesi 3-4<\/b><\/p>\n<ul>\n<li>Valve functional testing and operational checks<\/li>\n<li>Open and close position verification<\/li>\n<li>Actuator air supply and response checks<\/li>\n<li>Control valve stroke and signal verification<\/li>\n<li>Limit switch, feedback, and indication testing<\/li>\n<li>Leakage, abnormal movement, and connection inspection<\/li>\n<li>Final valve commissioning records and system release<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<\/blockquote>\n<p><\/br> Sejalan dengan teori yang disampaikan,sebanyak mungkin akan diberikan contoh-contoh studi kasus yang relevan dengan kondisi yang ada diindustri. Dalam hal ini peserta diberikan kesempatan untuk bertanya dan mendiskusikan topik-topik yang dibahas. <br \/><\/br> <center> <img decoding=\"async\" class=\"aligncenter size-full wp-image-23820\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2019\/09\/DEVELOP-Testimonial-WM-500.jpg\" alt=\"Valve Installation Verification and Commissioning\" width=\"400\" height=\"400\"><figcaption> Valve Installation Verification and Commissioning <\/figcaption><\/center> <br \/><\/br> Materi Training dirancang khusus oleh para praktisi dan tenaga ahli yang kompeten serta telah berpengalaman sesuai dengan experience dan solid knowledge  mereka. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun. <br \/><\/br> Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata. <br \/><\/br> \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f4427-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"4427\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/training\/wp-json\/wp\/v2\/posts\/9019#wpcf7-f4427-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"4427\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.2.5\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f4427-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<blockquote>\n\t<p><b>QUICK REGISTRATION &#10004;<\/b>\n\t<\/p>\n<\/blockquote>\n<div class=\"c-input-group\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Full name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Email\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel-428\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone\" value=\"\" type=\"tel\" name=\"tel-428\" \/><\/span>\n\t<\/p>\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"10\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Special message\" name=\"your-message\"><\/textarea><\/span>\n\t<\/p>\n\t<p><span id=\"wpcf7-6b00e322363b7-wrapper\" class=\"wpcf7-form-control-wrap cf7apps-honeypot-wrap honeypot-469-wrap\" data-cf7apps-honeypot=\"honeypot-469\" style=\"position:absolute;width:1px;height:1px;padding:0;margin:-1px;overflow:hidden;clip:rect(0,0,0,0);white-space:nowrap;border:0;\"><input type=\"hidden\" name=\"honeypot-469-random-hash\" value=\"20261121\"><input type=\"hidden\" name=\"honeypot-469-time-token\" value=\"MTc5NTIyMDI1OA==.1f15cc2d7a42e728aa0bdbcafa4438b315760b856b8c2a59b9ab54cc2ee588ab\"><label\n\t\t    for=\"wpcf7-6b00e322363b7-field\"\n\t\t    class=\"hp-message\"\n        >Please leave this field empty.<\/label><input\n\t    id=\"wpcf7-6b00e322363b7-field\"\n\t    \n\t    class=\"wpcf7-form-control wpcf7-text\"\n\t    type=\"text\"\n\t    name=\"ghyw3azccfl5\"\n\t    value=\"\"\n\t    autocomplete=\"new-password\"\n\t    tabindex=\"1000\"\n\t    data-cf7apps-tabindex=\"1000\"\n    \/><\/span><br \/>\n<input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"REGISTER NOW\" \/>\n\t<\/p>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.<\/p>\n","protected":false},"author":1,"featured_media":9275,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[38,50],"tags":[9697,9703,2499,9696,9698,9695,9700,9699,9694,9701,9702],"class_list":["post-9019","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-instrument-engineering","category-instrument-maintenance-operation","tag-control-valve-testing","tag-industrial-valve-commissioning","tag-instrument-engineering","tag-process-valve-inspection","tag-valve-actuator-commissioning","tag-valve-commissioning-training","tag-valve-flow-direction","tag-valve-functional-testing","tag-valve-installation-verification","tag-valve-leakage-inspection","tag-valve-stroke-testing"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Valve Installation Verification and Commissioning Training - DEVELOP\" \/>\n\t\t<meta property=\"og:description\" content=\"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2019-07-07T21:03:08+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-08-16T07:37:09+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Valve Installation Verification and Commissioning Training - DEVELOP\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#blogposting\",\"name\":\"Valve Installation Verification and Commissioning Training - DEVELOP\",\"headline\":\"Valve Installation Verification and Commissioning Training\",\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/valve-installation-verification-and-commissioning-training_9019_672e0.png\",\"width\":800,\"height\":600},\"datePublished\":\"2019-07-07T21:03:08+00:00\",\"dateModified\":\"2026-08-16T07:37:09+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#webpage\"},\"articleSection\":\"Instrument Engineering, Instrument Maintenance &amp; Operation, control valve testing, industrial valve commissioning, Instrument Engineering, process valve inspection, valve actuator commissioning, valve commissioning training, valve flow direction, valve functional testing, valve installation verification, valve leakage inspection, valve stroke testing\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"position\":2,\"name\":\"Engineering &amp; Technical\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/#listItem\",\"name\":\"Instrument Engineering\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/#listItem\",\"position\":3,\"name\":\"Instrument Engineering\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#listItem\",\"name\":\"Valve Installation Verification and Commissioning Training\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#listItem\",\"position\":4,\"name\":\"Valve Installation Verification and Commissioning Training\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/#listItem\",\"name\":\"Instrument Engineering\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DEVELOP-Logo-ls4-300x150-1.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#organizationLogo\",\"width\":300,\"height\":150},\"image\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g\",\"width\":96,\"height\":96}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#webpage\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/\",\"name\":\"Valve Installation Verification and Commissioning Training - DEVELOP\",\"description\":\"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/valve-installation-verification-and-commissioning-training_9019_672e0.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#mainImage\",\"width\":800,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/valve-installation-verification-and-commissioning-training\\\/#mainImage\"},\"datePublished\":\"2019-07-07T21:03:08+00:00\",\"dateModified\":\"2026-08-16T07:37:09+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Valve Installation Verification and Commissioning Training - DEVELOP","description":"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.","canonical_url":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#blogposting","name":"Valve Installation Verification and Commissioning Training - DEVELOP","headline":"Valve Installation Verification and Commissioning Training","author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/08\/valve-installation-verification-and-commissioning-training_9019_672e0.png","width":800,"height":600},"datePublished":"2019-07-07T21:03:08+00:00","dateModified":"2026-08-16T07:37:09+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#webpage"},"isPartOf":{"@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#webpage"},"articleSection":"Instrument Engineering, Instrument Maintenance &amp; Operation, control valve testing, industrial valve commissioning, Instrument Engineering, process valve inspection, valve actuator commissioning, valve commissioning training, valve flow direction, valve functional testing, valve installation verification, valve leakage inspection, valve stroke testing"},{"@type":"BreadcrumbList","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","position":1,"name":"Home","item":"https:\/\/develop.co.id\/training\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","position":2,"name":"Engineering &amp; Technical","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/#listItem","name":"Instrument Engineering"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/#listItem","position":3,"name":"Instrument Engineering","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#listItem","name":"Valve Installation Verification and Commissioning Training"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#listItem","position":4,"name":"Valve Installation Verification and Commissioning Training","previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/#listItem","name":"Instrument Engineering"}}]},{"@type":"Organization","@id":"https:\/\/develop.co.id\/training\/#organization","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","url":"https:\/\/develop.co.id\/training\/","logo":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#organizationLogo","width":300,"height":150},"image":{"@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author","url":"https:\/\/develop.co.id\/training\/author\/developtraining\/","image":{"@type":"ImageObject","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g","width":96,"height":96}},{"@type":"WebPage","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#webpage","url":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/","name":"Valve Installation Verification and Commissioning Training - DEVELOP","description":"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/develop.co.id\/training\/#website"},"breadcrumb":{"@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#breadcrumblist"},"author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"creator":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/08\/valve-installation-verification-and-commissioning-training_9019_672e0.png","@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#mainImage","width":800,"height":600},"primaryImageOfPage":{"@id":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/#mainImage"},"datePublished":"2019-07-07T21:03:08+00:00","dateModified":"2026-08-16T07:37:09+00:00"},{"@type":"WebSite","@id":"https:\/\/develop.co.id\/training\/#website","url":"https:\/\/develop.co.id\/training\/","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","inLanguage":"en-US","publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"}}]},"og:locale":"en_US","og:site_name":"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist","og:type":"article","og:title":"Valve Installation Verification and Commissioning Training - DEVELOP","og:description":"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.","og:url":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/","og:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","og:image:secure_url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","article:published_time":"2019-07-07T21:03:08+00:00","article:modified_time":"2026-08-16T07:37:09+00:00","twitter:card":"summary_large_image","twitter:title":"Valve Installation Verification and Commissioning Training - DEVELOP","twitter:description":"Pelajari teknik valve installation verification dan commissioning untuk memastikan orientation, actuator, stroke, feedback, koneksi, dan fungsi valve siap beroperasi.","twitter:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png"},"aioseo_meta_data":{"post_id":"9019","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-08-16 12:05:53","updated":"2026-08-20 01:16:31","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/\" title=\"Engineering &amp; Technical\">Engineering &amp; Technical<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/\" title=\"Instrument Engineering\">Instrument Engineering<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tValve Installation Verification and Commissioning Training\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/develop.co.id\/training\/"},{"label":"Engineering &amp; Technical","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/"},{"label":"Instrument Engineering","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/"},{"label":"Valve Installation Verification and Commissioning Training","link":"https:\/\/develop.co.id\/training\/valve-installation-verification-and-commissioning-training\/"}],"_links":{"self":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/9019","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/comments?post=9019"}],"version-history":[{"count":0,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/9019\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media\/9275"}],"wp:attachment":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media?parent=9019"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/categories?post=9019"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/tags?post=9019"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}