{"id":15501,"date":"2016-06-03T23:32:47","date_gmt":"2016-06-03T23:32:47","guid":{"rendered":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/"},"modified":"2026-10-11T02:10:45","modified_gmt":"2026-10-11T02:10:45","slug":"skid-mounted-refinery-construction-training","status":"publish","type":"post","link":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/","title":{"rendered":"Skid-Mounted Refinery Construction Training"},"content":{"rendered":"<p>DEVELOP Training Center menyelenggarakan Kelas Skid-Mounted Refinery Construction yang sangat berguna untuk mendapatkan pengetahuan tentang konstruksi unit kilang skid-mounted melalui perakitan modul, penyambungan perpipaan dan utilitas, serta verifikasi kesiapan struktural dan mekanis untuk instalasi dan start-up. <br \/><\/br> Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur. <br \/><\/br> <center> <img fetchpriority=\"high\" decoding=\"async\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2025\/09\/DV-GEN-021.jpg\" alt=\"Skid-Mounted Refinery Construction\" width=\"500\" height=\"500\"><figcaption> Skid-Mounted Refinery Construction <\/figcaption><\/center> <br \/><\/br> DEVELOP mengimplementasikan Syllabus Kelas Skid-Mounted Refinery Construction Training dengan tahap pembelajaran berkualitas sebagai berikut:<\/p>\n<blockquote><p><b>Sesi 1-2<\/b><\/p>\n<ul>\n<li>Skid-mounted unit concepts and modular construction benefits<\/li>\n<li>Skid structural frame design and load distribution<\/li>\n<li>Module layout and equipment arrangement on skids<\/li>\n<li>Lifting points, spreader beams, and rigging design<\/li>\n<li>Structural steel fabrication and welding requirements<\/li>\n<li>Equipment mounting and vibration isolation on skids<\/li>\n<li>Piping layout within skid boundaries<\/li>\n<li>Flange management and bolt torque control<\/li>\n<li>Valve and instrument placement for operability<\/li>\n<li>Electrical panel and cable routing on skids<\/li>\n<li>Utility connection points and tie-in interfaces<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<p><b>Sesi 3-4<\/b><\/p>\n<ul>\n<li>Skid assembly sequence and dimensional control<\/li>\n<li>Alignment of rotating equipment mounted on skids<\/li>\n<li>Piping hydrotest and leak testing on skids<\/li>\n<li>Electrical and instrumentation loop checking<\/li>\n<li>Preservation and protection during transport<\/li>\n<li>Shipping, lifting, and site placement procedures<\/li>\n<li>Site tie-in connection and alignment verification<\/li>\n<li>Commissioning checks for skid-mounted systems<\/li>\n<li>Quality documentation and inspection records<\/li>\n<li>Safety measures during modular construction and lifting<\/li>\n<li>Maintenance access and serviceability review<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<\/blockquote>\n<p><\/br> Materi teori akan dilengkapi dengan berbagai contoh studi kasus yang relevan dengan kondisi aktual di industri. Peserta diberikan kesempatan untuk bertanya dan berdiskusi secara mendalam mengenai topik-topik yang dibahas. <br \/><\/br> <center> <img decoding=\"async\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2025\/09\/DV-TESTIMONIAL-008.jpg\" alt=\"Skid-Mounted Refinery Construction\" width=\"500\" height=\"500\"><figcaption> Skid-Mounted Refinery Construction <\/figcaption><\/center> <br \/><\/br> Materi Training dirancang khusus oleh para praktisi dan tenaga ahli yang kompeten serta telah berpengalaman sesuai dengan experience dan solid knowledge  mereka. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun. <br \/><\/br> Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata. <br \/><\/br> \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f4427-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"4427\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/training\/wp-json\/wp\/v2\/posts\/15501#wpcf7-f4427-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"4427\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.2.5\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f4427-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<blockquote>\n\t<p><b>QUICK REGISTRATION &#10004;<\/b>\n\t<\/p>\n<\/blockquote>\n<div class=\"c-input-group\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Full name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Email\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel-428\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone\" value=\"\" type=\"tel\" name=\"tel-428\" \/><\/span>\n\t<\/p>\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"10\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Special message\" name=\"your-message\"><\/textarea><\/span>\n\t<\/p>\n\t<p><span id=\"wpcf7-6b006254e12b2-wrapper\" class=\"wpcf7-form-control-wrap cf7apps-honeypot-wrap honeypot-469-wrap\" data-cf7apps-honeypot=\"honeypot-469\" style=\"position:absolute;width:1px;height:1px;padding:0;margin:-1px;overflow:hidden;clip:rect(0,0,0,0);white-space:nowrap;border:0;\"><input type=\"hidden\" name=\"honeypot-469-random-hash\" value=\"20261120\"><input type=\"hidden\" name=\"honeypot-469-time-token\" value=\"MTc5NTE4NzI4NA==.81fc9e8c18bdba1d639dd1de1e30ef7b8c6f9f29fbbb0ae039c66a713e683314\"><label\n\t\t    for=\"wpcf7-6b006254e12b2-field\"\n\t\t    class=\"hp-message\"\n        >Please leave this field empty.<\/label><input\n\t    id=\"wpcf7-6b006254e12b2-field\"\n\t    \n\t    class=\"wpcf7-form-control wpcf7-text\"\n\t    type=\"text\"\n\t    name=\"myqsshrb9us9\"\n\t    value=\"\"\n\t    autocomplete=\"new-password\"\n\t    tabindex=\"1000\"\n\t    data-cf7apps-tabindex=\"1000\"\n    \/><\/span><br \/>\n<input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"REGISTER NOW\" \/>\n\t<\/p>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.<\/p>\n","protected":false},"author":1,"featured_media":15566,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[38,50,54],"tags":[19901,19897,19900,162,19898,19903,19905,19899,19902,19896,19904],"class_list":["post-15501","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-instrument-engineering","category-instrument-maintenance-operation","category-process-maintenance-operation","tag-modular-construction-program","tag-modular-refinery-course","tag-piping-skid-installation","tag-process-engineering","tag-refinery-module-assembly","tag-refinery-skid-commissioning","tag-site-tie-in-training","tag-skid-fabrication-training","tag-skid-lifting-plan","tag-skid-mounted-construction-training","tag-structural-skid-design"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Skid-Mounted Refinery Construction Training - DEVELOP\" \/>\n\t\t<meta property=\"og:description\" content=\"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2016-06-03T23:32:47+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-11T02:10:45+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Skid-Mounted Refinery Construction Training - DEVELOP\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#blogposting\",\"name\":\"Skid-Mounted Refinery Construction Training - DEVELOP\",\"headline\":\"Skid-Mounted Refinery Construction Training\",\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/skid-mounted-refinery-construction-training_15501_7b5bc.png\",\"width\":800,\"height\":600},\"datePublished\":\"2016-06-03T23:32:47+00:00\",\"dateModified\":\"2026-10-11T02:10:45+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#webpage\"},\"articleSection\":\"Instrument Engineering, Instrument Maintenance &amp; Operation, Process Maintenance &amp; Operation, modular construction program, modular refinery course, piping skid installation, Process Engineering, refinery module assembly, refinery skid commissioning, site tie-in training, skid fabrication training, skid lifting plan, skid mounted construction training, structural skid design\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"position\":2,\"name\":\"Engineering &amp; Technical\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/#listItem\",\"name\":\"Instrument Engineering\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/#listItem\",\"position\":3,\"name\":\"Instrument Engineering\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#listItem\",\"name\":\"Skid-Mounted Refinery Construction Training\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#listItem\",\"position\":4,\"name\":\"Skid-Mounted Refinery Construction Training\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/instrument-engineering\\\/#listItem\",\"name\":\"Instrument Engineering\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DEVELOP-Logo-ls4-300x150-1.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#organizationLogo\",\"width\":300,\"height\":150},\"image\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g\",\"width\":96,\"height\":96}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#webpage\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/\",\"name\":\"Skid-Mounted Refinery Construction Training - DEVELOP\",\"description\":\"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/skid-mounted-refinery-construction-training_15501_7b5bc.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#mainImage\",\"width\":800,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/skid-mounted-refinery-construction-training\\\/#mainImage\"},\"datePublished\":\"2016-06-03T23:32:47+00:00\",\"dateModified\":\"2026-10-11T02:10:45+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Skid-Mounted Refinery Construction Training - DEVELOP","description":"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.","canonical_url":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#blogposting","name":"Skid-Mounted Refinery Construction Training - DEVELOP","headline":"Skid-Mounted Refinery Construction Training","author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/10\/skid-mounted-refinery-construction-training_15501_7b5bc.png","width":800,"height":600},"datePublished":"2016-06-03T23:32:47+00:00","dateModified":"2026-10-11T02:10:45+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#webpage"},"isPartOf":{"@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#webpage"},"articleSection":"Instrument Engineering, Instrument Maintenance &amp; Operation, Process Maintenance &amp; Operation, modular construction program, modular refinery course, piping skid installation, Process Engineering, refinery module assembly, refinery skid commissioning, site tie-in training, skid fabrication training, skid lifting plan, skid mounted construction training, structural skid design"},{"@type":"BreadcrumbList","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","position":1,"name":"Home","item":"https:\/\/develop.co.id\/training\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","position":2,"name":"Engineering &amp; Technical","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/#listItem","name":"Instrument Engineering"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/#listItem","position":3,"name":"Instrument Engineering","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#listItem","name":"Skid-Mounted Refinery Construction Training"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#listItem","position":4,"name":"Skid-Mounted Refinery Construction Training","previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/#listItem","name":"Instrument Engineering"}}]},{"@type":"Organization","@id":"https:\/\/develop.co.id\/training\/#organization","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","url":"https:\/\/develop.co.id\/training\/","logo":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#organizationLogo","width":300,"height":150},"image":{"@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author","url":"https:\/\/develop.co.id\/training\/author\/developtraining\/","image":{"@type":"ImageObject","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g","width":96,"height":96}},{"@type":"WebPage","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#webpage","url":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/","name":"Skid-Mounted Refinery Construction Training - DEVELOP","description":"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/develop.co.id\/training\/#website"},"breadcrumb":{"@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#breadcrumblist"},"author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"creator":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/10\/skid-mounted-refinery-construction-training_15501_7b5bc.png","@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#mainImage","width":800,"height":600},"primaryImageOfPage":{"@id":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/#mainImage"},"datePublished":"2016-06-03T23:32:47+00:00","dateModified":"2026-10-11T02:10:45+00:00"},{"@type":"WebSite","@id":"https:\/\/develop.co.id\/training\/#website","url":"https:\/\/develop.co.id\/training\/","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","inLanguage":"en-US","publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"}}]},"og:locale":"en_US","og:site_name":"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist","og:type":"article","og:title":"Skid-Mounted Refinery Construction Training - DEVELOP","og:description":"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.","og:url":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/","og:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","og:image:secure_url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","article:published_time":"2016-06-03T23:32:47+00:00","article:modified_time":"2026-10-11T02:10:45+00:00","twitter:card":"summary_large_image","twitter:title":"Skid-Mounted Refinery Construction Training - DEVELOP","twitter:description":"Pelajari konstruksi unit kilang skid-mounted, dari perakitan modul hingga verifikasi kesiapan untuk instalasi dan start-up.","twitter:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png"},"aioseo_meta_data":{"post_id":"15501","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-10-11 02:09:32","updated":"2026-10-11 02:22:06","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/\" title=\"Engineering &amp; Technical\">Engineering &amp; Technical<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/\" title=\"Instrument Engineering\">Instrument Engineering<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tSkid-Mounted Refinery Construction Training\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/develop.co.id\/training\/"},{"label":"Engineering &amp; Technical","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/"},{"label":"Instrument Engineering","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/instrument-engineering\/"},{"label":"Skid-Mounted Refinery Construction Training","link":"https:\/\/develop.co.id\/training\/skid-mounted-refinery-construction-training\/"}],"_links":{"self":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/15501","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/comments?post=15501"}],"version-history":[{"count":0,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/15501\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media\/15566"}],"wp:attachment":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media?parent=15501"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/categories?post=15501"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/tags?post=15501"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}