{"id":13425,"date":"2013-04-14T00:42:37","date_gmt":"2013-04-14T00:42:37","guid":{"rendered":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/"},"modified":"2026-09-20T04:59:26","modified_gmt":"2026-09-20T04:59:26","slug":"piping-specification-control-for-multi-unit-refinery-projects-training","status":"publish","type":"post","link":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/","title":{"rendered":"Piping Specification Control for Multi-Unit Refinery Projects Training"},"content":{"rendered":"<p>DEVELOP Training Center menyelenggarakan Kelas Piping Specification Control for Multi-Unit Refinery Projects yang sangat berguna untuk mendapatkan pengetahuan tentang pengendalian spesifikasi perpipaan pada proyek kilang multi-unit, mencakup kelas material, rating, kondisi desain, perubahan spesifikasi, dan konsistensi antarunit. <br \/><\/br> Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur. <br \/><\/br> <center> <img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-22971\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2025\/07\/DV-GEN-039.jpg\" alt=\"Piping Specification Control for Multi-Unit Refinery Projects\" width=\"284\" height=\"271\"><figcaption> Piping Specification Control for Multi-Unit Refinery Projects <\/figcaption><\/center> <br \/><\/br> DEVELOP mengimplementasikan Syllabus Kelas Piping Specification Control for Multi-Unit Refinery Projects Training dengan tahap pembelajaran berkualitas sebagai berikut:<\/p>\n<blockquote><p><b>Sesi 1-2<\/b><\/p>\n<ul>\n<li>Refinery piping specification structure across multiple process units<\/li>\n<li>Piping material classes and service-based specification assignment<\/li>\n<li>Specification boundaries between process, utility, and offsite systems<\/li>\n<li>Pipe, fitting, flange, valve, and gasket specification requirements<\/li>\n<li>Material grades and pressure-temperature rating references<\/li>\n<li>Corrosion allowance requirements within piping specifications<\/li>\n<li>Branch connection and specialty component specification requirements<\/li>\n<li>Design conditions affecting piping class selection<\/li>\n<li>Specification consistency across interconnected refinery units<\/li>\n<li>Specification references on piping layouts and isometric drawings<\/li>\n<li>Control of approved piping specification documents and revisions<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<p><b>Sesi 3-4<\/b><\/p>\n<ul>\n<li>Specification deviations and technical query management<\/li>\n<li>Material substitution review against approved piping classes<\/li>\n<li>Vendor package piping specification interface requirements<\/li>\n<li>Specification requirements for high-temperature process services<\/li>\n<li>Specification requirements for sour and corrosive hydrocarbon services<\/li>\n<li>Valve specification alignment with process and piping classes<\/li>\n<li>Flange rating verification across connected piping systems<\/li>\n<li>Specification changes affecting procurement and fabrication<\/li>\n<li>Multi-unit specification consistency checks before construction release<\/li>\n<li>Specification registers and revision tracking across project disciplines<\/li>\n<li>Final piping specification verification for project handover<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<\/blockquote>\n<p><\/br> Sejalan dengan teori yang disampaikan,sebanyak mungkin akan diberikan contoh-contoh studi kasus yang relevan dengan kondisi yang ada diindustri. Dalam hal ini peserta diberikan kesempatan untuk bertanya dan mendiskusikan topik-topik yang dibahas. <br \/><\/br> <center> <img decoding=\"async\" class=\"aligncenter size-full wp-image-23820\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2019\/09\/DEVELOP-Testimonial-WM-500.jpg\" alt=\"Piping Specification Control for Multi-Unit Refinery Projects\" width=\"400\" height=\"400\"><figcaption> Piping Specification Control for Multi-Unit Refinery Projects <\/figcaption><\/center> <br \/><\/br> Materi Training dirancang khusus oleh para praktisi dan tenaga ahli yang kompeten serta telah berpengalaman sesuai dengan experience dan solid knowledge  mereka. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun. <br \/><\/br> Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata. <br \/><\/br> \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f4427-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"4427\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/training\/wp-json\/wp\/v2\/posts\/13425#wpcf7-f4427-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"4427\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.2.5\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f4427-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<blockquote>\n\t<p><b>QUICK REGISTRATION &#10004;<\/b>\n\t<\/p>\n<\/blockquote>\n<div class=\"c-input-group\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Full name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Email\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel-428\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone\" value=\"\" type=\"tel\" name=\"tel-428\" \/><\/span>\n\t<\/p>\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"10\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Special message\" name=\"your-message\"><\/textarea><\/span>\n\t<\/p>\n\t<p><span id=\"wpcf7-6b006b4ed2c14-wrapper\" class=\"wpcf7-form-control-wrap cf7apps-honeypot-wrap honeypot-469-wrap\" data-cf7apps-honeypot=\"honeypot-469\" style=\"position:absolute;width:1px;height:1px;padding:0;margin:-1px;overflow:hidden;clip:rect(0,0,0,0);white-space:nowrap;border:0;\"><input type=\"hidden\" name=\"honeypot-469-random-hash\" value=\"20261120\"><input type=\"hidden\" name=\"honeypot-469-time-token\" value=\"MTc5NTE4OTU4Mg==.7682eba049ed898bf9fb45a2bb830f68ad8139790ad5312f776bd9c074a99171\"><label\n\t\t    for=\"wpcf7-6b006b4ed2c14-field\"\n\t\t    class=\"hp-message\"\n        >Please leave this field empty.<\/label><input\n\t    id=\"wpcf7-6b006b4ed2c14-field\"\n\t    \n\t    class=\"wpcf7-form-control wpcf7-text\"\n\t    type=\"text\"\n\t    name=\"myqsshrb9us9\"\n\t    value=\"\"\n\t    autocomplete=\"new-password\"\n\t    tabindex=\"1000\"\n\t    data-cf7apps-tabindex=\"1000\"\n    \/><\/span><br \/>\n<input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"REGISTER NOW\" \/>\n\t<\/p>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.<\/p>\n","protected":false},"author":1,"featured_media":14495,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[47,53],"tags":[16493,16488,15994,16489,6510,16491,6525,16494,16490,16487,16492],"class_list":["post-13425","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-piping-engineering","category-piping-maintenance-operation","tag-epc-piping-specification","tag-multi-unit-refinery-piping","tag-piping","tag-piping-material-class","tag-piping-material-selection","tag-piping-specification-management","tag-process-piping-class","tag-refinery-piping-documentation","tag-refinery-piping-engineering","tag-refinery-piping-specification-control","tag-refinery-valve-specification"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP\" \/>\n\t\t<meta property=\"og:description\" content=\"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2013-04-14T00:42:37+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-20T04:59:26+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#blogposting\",\"name\":\"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP\",\"headline\":\"Piping Specification Control for Multi-Unit Refinery Projects Training\",\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/piping-specification-control-for-multi-unit-refinery-projects-training_13425_5b379.png\",\"width\":800,\"height\":600},\"datePublished\":\"2013-04-14T00:42:37+00:00\",\"dateModified\":\"2026-09-20T04:59:26+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#webpage\"},\"articleSection\":\"Piping Engineering, Piping Maintenance &amp; Operation, EPC piping specification, multi unit refinery piping, Piping, piping material class, piping material selection, piping specification management, process piping class, refinery piping documentation, refinery piping engineering, refinery piping specification control, refinery valve specification\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"position\":2,\"name\":\"Engineering &amp; Technical\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/piping-engineering\\\/#listItem\",\"name\":\"Piping Engineering\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/piping-engineering\\\/#listItem\",\"position\":3,\"name\":\"Piping Engineering\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/piping-engineering\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#listItem\",\"name\":\"Piping Specification Control for Multi-Unit Refinery Projects Training\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#listItem\",\"position\":4,\"name\":\"Piping Specification Control for Multi-Unit Refinery Projects Training\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/piping-engineering\\\/#listItem\",\"name\":\"Piping Engineering\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DEVELOP-Logo-ls4-300x150-1.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#organizationLogo\",\"width\":300,\"height\":150},\"image\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g\",\"width\":96,\"height\":96}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#webpage\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/\",\"name\":\"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP\",\"description\":\"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/piping-specification-control-for-multi-unit-refinery-projects-training_13425_5b379.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#mainImage\",\"width\":800,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/piping-specification-control-for-multi-unit-refinery-projects-training\\\/#mainImage\"},\"datePublished\":\"2013-04-14T00:42:37+00:00\",\"dateModified\":\"2026-09-20T04:59:26+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP","description":"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.","canonical_url":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#blogposting","name":"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP","headline":"Piping Specification Control for Multi-Unit Refinery Projects Training","author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/09\/piping-specification-control-for-multi-unit-refinery-projects-training_13425_5b379.png","width":800,"height":600},"datePublished":"2013-04-14T00:42:37+00:00","dateModified":"2026-09-20T04:59:26+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#webpage"},"isPartOf":{"@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#webpage"},"articleSection":"Piping Engineering, Piping Maintenance &amp; Operation, EPC piping specification, multi unit refinery piping, Piping, piping material class, piping material selection, piping specification management, process piping class, refinery piping documentation, refinery piping engineering, refinery piping specification control, refinery valve specification"},{"@type":"BreadcrumbList","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","position":1,"name":"Home","item":"https:\/\/develop.co.id\/training\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","position":2,"name":"Engineering &amp; Technical","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/piping-engineering\/#listItem","name":"Piping Engineering"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/piping-engineering\/#listItem","position":3,"name":"Piping Engineering","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/piping-engineering\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#listItem","name":"Piping Specification Control for Multi-Unit Refinery Projects Training"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#listItem","position":4,"name":"Piping Specification Control for Multi-Unit Refinery Projects Training","previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/piping-engineering\/#listItem","name":"Piping Engineering"}}]},{"@type":"Organization","@id":"https:\/\/develop.co.id\/training\/#organization","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","url":"https:\/\/develop.co.id\/training\/","logo":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#organizationLogo","width":300,"height":150},"image":{"@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author","url":"https:\/\/develop.co.id\/training\/author\/developtraining\/","image":{"@type":"ImageObject","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g","width":96,"height":96}},{"@type":"WebPage","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#webpage","url":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/","name":"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP","description":"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/develop.co.id\/training\/#website"},"breadcrumb":{"@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#breadcrumblist"},"author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"creator":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/09\/piping-specification-control-for-multi-unit-refinery-projects-training_13425_5b379.png","@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#mainImage","width":800,"height":600},"primaryImageOfPage":{"@id":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/#mainImage"},"datePublished":"2013-04-14T00:42:37+00:00","dateModified":"2026-09-20T04:59:26+00:00"},{"@type":"WebSite","@id":"https:\/\/develop.co.id\/training\/#website","url":"https:\/\/develop.co.id\/training\/","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","inLanguage":"en-US","publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"}}]},"og:locale":"en_US","og:site_name":"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist","og:type":"article","og:title":"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP","og:description":"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.","og:url":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/","og:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","og:image:secure_url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","article:published_time":"2013-04-14T00:42:37+00:00","article:modified_time":"2026-09-20T04:59:26+00:00","twitter:card":"summary_large_image","twitter:title":"Piping Specification Control for Multi-Unit Refinery Projects Training - DEVELOP","twitter:description":"Pelajari pengendalian spesifikasi perpipaan untuk proyek kilang multi-unit. Tingkatkan kemampuan menjaga konsistensi material, rating, kelas, dan perubahan desain.","twitter:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png"},"aioseo_meta_data":{"post_id":"13425","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-09-20 04:58:23","updated":"2026-09-20 07:05:32","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/\" title=\"Engineering &amp; Technical\">Engineering &amp; Technical<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/piping-engineering\/\" title=\"Piping Engineering\">Piping Engineering<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tPiping Specification Control for Multi-Unit Refinery Projects Training\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/develop.co.id\/training\/"},{"label":"Engineering &amp; Technical","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/"},{"label":"Piping Engineering","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/piping-engineering\/"},{"label":"Piping Specification Control for Multi-Unit Refinery Projects Training","link":"https:\/\/develop.co.id\/training\/piping-specification-control-for-multi-unit-refinery-projects-training\/"}],"_links":{"self":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/13425","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/comments?post=13425"}],"version-history":[{"count":0,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/13425\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media\/14495"}],"wp:attachment":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media?parent=13425"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/categories?post=13425"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/tags?post=13425"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}