{"id":13312,"date":"2019-02-10T15:32:27","date_gmt":"2019-02-10T15:32:27","guid":{"rendered":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/"},"modified":"2026-09-20T04:54:54","modified_gmt":"2026-09-20T04:54:54","slug":"temporary-construction-roads-for-remote-oilfield-projects-training","status":"publish","type":"post","link":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/","title":{"rendered":"Temporary Construction Roads for Remote Oilfield Projects Training"},"content":{"rendered":"<p>DEVELOP Training Center menyelenggarakan Kelas Temporary Construction Roads for Remote Oilfield Projects yang sangat berguna untuk mendapatkan pengetahuan tentang jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup kondisi tanah, beban kendaraan, lapisan perkerasan, drainase, penguatan, erosi, dan pemeliharaan. <br \/><\/br> Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur. <br \/><\/br> <center> <img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-6397\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2025\/07\/DV-TESTIMONIAL-028.jpg\" alt=\"Temporary Construction Roads for Remote Oilfield Projects\" width=\"300\" height=\"300\"><figcaption> Temporary Construction Roads for Remote Oilfield Projects <\/figcaption><\/center> <br \/><\/br> DEVELOP mengimplementasikan Syllabus Kelas Temporary Construction Roads for Remote Oilfield Projects Training dengan tahap pembelajaran berkualitas sebagai berikut:<\/p>\n<blockquote><p><b>Sesi 1-2<\/b><\/p>\n<ul>\n<li>Temporary road requirements for remote oilfield construction projects<\/li>\n<li>Route selection and terrain assessment for remote access<\/li>\n<li>Heavy construction vehicle loading and traffic classification<\/li>\n<li>Subgrade investigation and soil bearing characteristics<\/li>\n<li>Weak ground, soft soil, and seasonal moisture conditions<\/li>\n<li>Temporary road width and vehicle passing requirements<\/li>\n<li>Aggregate base and subbase material selection<\/li>\n<li>Geotextile and geogrid reinforcement applications<\/li>\n<li>Road crossfall and surface drainage arrangements<\/li>\n<li>Watercourse crossings and temporary drainage structures<\/li>\n<li>Construction equipment access and turning requirements<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<p><b>Sesi 3-4<\/b><\/p>\n<ul>\n<li>Temporary pavement thickness for heavy construction traffic<\/li>\n<li>Ground improvement for low-bearing-capacity soils<\/li>\n<li>Temporary culverts and drainage crossing design<\/li>\n<li>Erosion control along temporary access routes<\/li>\n<li>Road embankment stability and slope protection<\/li>\n<li>Wet weather access and surface water management<\/li>\n<li>Maintenance requirements under repeated heavy traffic<\/li>\n<li>Road widening and local strengthening at turning areas<\/li>\n<li>Removal and restoration after construction completion<\/li>\n<li>Material testing and field density verification<\/li>\n<li>Condition inspection during project operations<\/li>\n<li>Preparation of temporary road layouts and calculations<\/li>\n<li>Case Study<\/li>\n<\/ul>\n<\/blockquote>\n<p><\/br> Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas. <br \/><\/br> <center> <img decoding=\"async\" class=\"aligncenter size-full wp-image-23813\" src=\"https:\/\/develop.co.id\/wp-content\/uploads\/2025\/07\/DV-TESTIMONIAL-028.jpg\" alt=\"Temporary Construction Roads for Remote Oilfield Projects\" width=\"400\" height=\"400\"><figcaption> Temporary Construction Roads for Remote Oilfield Projects <\/figcaption><\/center> <br \/><\/br> Materi Training dirancang khusus oleh para praktisi dan tenaga ahli yang kompeten serta telah berpengalaman sesuai dengan experience dan solid knowledge  mereka. Anda akan mendapat sharing ilmu langsung dari para praktisi yang berpengalaman bertahun-tahun. <br \/><\/br> Selama training, instruktur kami akan menggunakan kombinasi teori serta praktek langsung dengan studi kasus telah dipersiapkan yang menyerupai Proyek nyata. <br \/><\/br> \n<div class=\"wpcf7 no-js\" id=\"wpcf7-f4427-o1\" lang=\"en-US\" dir=\"ltr\" data-wpcf7-id=\"4427\">\n<div class=\"screen-reader-response\"><p role=\"status\" aria-live=\"polite\" aria-atomic=\"true\"><\/p> <ul><\/ul><\/div>\n<form action=\"\/training\/wp-json\/wp\/v2\/posts\/13312#wpcf7-f4427-o1\" method=\"post\" class=\"wpcf7-form init\" aria-label=\"Contact form\" novalidate=\"novalidate\" data-status=\"init\">\n<fieldset class=\"hidden-fields-container\"><input type=\"hidden\" name=\"_wpcf7\" value=\"4427\" \/><input type=\"hidden\" name=\"_wpcf7_version\" value=\"6.2.5\" \/><input type=\"hidden\" name=\"_wpcf7_locale\" value=\"en_US\" \/><input type=\"hidden\" name=\"_wpcf7_unit_tag\" value=\"wpcf7-f4427-o1\" \/><input type=\"hidden\" name=\"_wpcf7_container_post\" value=\"0\" \/><input type=\"hidden\" name=\"_wpcf7_posted_data_hash\" value=\"\" \/>\n<\/fieldset>\n<blockquote>\n\t<p><b>QUICK REGISTRATION &#10004;<\/b>\n\t<\/p>\n<\/blockquote>\n<div class=\"c-input-group\">\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-name\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-text wpcf7-validates-as-required\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Full name\" value=\"\" type=\"text\" name=\"your-name\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"your-email\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-email wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-email\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Email\" value=\"\" type=\"email\" name=\"your-email\" \/><\/span><br \/>\n<span class=\"wpcf7-form-control-wrap\" data-name=\"tel-428\"><input size=\"40\" maxlength=\"400\" class=\"wpcf7-form-control wpcf7-tel wpcf7-validates-as-required wpcf7-text wpcf7-validates-as-tel\" aria-required=\"true\" aria-invalid=\"false\" placeholder=\"Phone\" value=\"\" type=\"tel\" name=\"tel-428\" \/><\/span>\n\t<\/p>\n\t<p><span class=\"wpcf7-form-control-wrap\" data-name=\"your-message\"><textarea cols=\"10\" rows=\"10\" maxlength=\"2000\" class=\"wpcf7-form-control wpcf7-textarea\" aria-invalid=\"false\" placeholder=\"Special message\" name=\"your-message\"><\/textarea><\/span>\n\t<\/p>\n\t<p><span id=\"wpcf7-6b010afaae410-wrapper\" class=\"wpcf7-form-control-wrap cf7apps-honeypot-wrap honeypot-469-wrap\" data-cf7apps-honeypot=\"honeypot-469\" style=\"position:absolute;width:1px;height:1px;padding:0;margin:-1px;overflow:hidden;clip:rect(0,0,0,0);white-space:nowrap;border:0;\"><input type=\"hidden\" name=\"honeypot-469-random-hash\" value=\"20261121\"><input type=\"hidden\" name=\"honeypot-469-time-token\" value=\"MTc5NTIzMDQ1OA==.65fe192417e9dffc214a567b92dc64d32dfcb1e80f63102b23b374d9a03d713b\"><label\n\t\t    for=\"wpcf7-6b010afaae410-field\"\n\t\t    class=\"hp-message\"\n        >Please leave this field empty.<\/label><input\n\t    id=\"wpcf7-6b010afaae410-field\"\n\t    \n\t    class=\"wpcf7-form-control wpcf7-text\"\n\t    type=\"text\"\n\t    name=\"ghyw3azccfl5\"\n\t    value=\"\"\n\t    autocomplete=\"new-password\"\n\t    tabindex=\"1000\"\n\t    data-cf7apps-tabindex=\"1000\"\n    \/><\/span><br \/>\n<input class=\"wpcf7-form-control wpcf7-submit has-spinner\" type=\"submit\" value=\"REGISTER NOW\" \/>\n\t<\/p>\n<\/div><div class=\"wpcf7-response-output\" aria-hidden=\"true\"><\/div>\n<\/form>\n<\/div>\n<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.<\/p>\n","protected":false},"author":1,"featured_media":14308,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_monsterinsights_skip_tracking":false,"footnotes":""},"categories":[33,55],"tags":[15192,15413,15410,15408,15412,15406,15405,15409,15411,15404,15407],"class_list":["post-13312","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-civil-engineering","category-structure-maintenance-operation","tag-civil","tag-construction-road-maintenance","tag-geogrid-road-reinforcement","tag-heavy-construction-traffic","tag-oilfield-access-engineering","tag-oilfield-haul-road-design","tag-remote-construction-access","tag-remote-site-road-construction","tag-temporary-drainage-roads","tag-temporary-oilfield-roads","tag-temporary-pavement-engineering"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO 5.0.5.1 - aioseo.com -->\n\t<meta name=\"description\" content=\"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.\" \/>\n\t<meta name=\"robots\" content=\"max-image-preview:large\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO (AIOSEO) 5.0.5.1\" \/>\n\t\t<meta property=\"og:locale\" content=\"en_US\" \/>\n\t\t<meta property=\"og:site_name\" content=\"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP\" \/>\n\t\t<meta property=\"og:description\" content=\"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2019-02-10T15:32:27+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-09-20T04:54:54+00:00\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#blogposting\",\"name\":\"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP\",\"headline\":\"Temporary Construction Roads for Remote Oilfield Projects Training\",\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/temporary-construction-roads-for-remote-oilfield-projects-training_13312_e5739.png\",\"width\":800,\"height\":600},\"datePublished\":\"2019-02-10T15:32:27+00:00\",\"dateModified\":\"2026-09-20T04:54:54+00:00\",\"inLanguage\":\"en-US\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#webpage\"},\"articleSection\":\"Civil Engineering, Structure Maintenance &amp; Operation, Civil, construction road maintenance, geogrid road reinforcement, heavy construction traffic, oilfield access engineering, oilfield haul road design, remote construction access, remote site road construction, temporary drainage roads, temporary oilfield roads, temporary pavement engineering\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"position\":2,\"name\":\"Engineering &amp; Technical\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/civil-engineering\\\/#listItem\",\"name\":\"Civil Engineering\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/civil-engineering\\\/#listItem\",\"position\":3,\"name\":\"Civil Engineering\",\"item\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/civil-engineering\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#listItem\",\"name\":\"Temporary Construction Roads for Remote Oilfield Projects Training\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/#listItem\",\"name\":\"Engineering &amp; Technical\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#listItem\",\"position\":4,\"name\":\"Temporary Construction Roads for Remote Oilfield Projects Training\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/category\\\/engineering-technical\\\/civil-engineering\\\/#listItem\",\"name\":\"Civil Engineering\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/DEVELOP-Logo-ls4-300x150-1.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#organizationLogo\",\"width\":300,\"height\":150},\"image\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#organizationLogo\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g\",\"width\":96,\"height\":96}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#webpage\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/\",\"name\":\"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP\",\"description\":\"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.\",\"inLanguage\":\"en-US\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/author\\\/developtraining\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/temporary-construction-roads-for-remote-oilfield-projects-training_13312_e5739.png\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#mainImage\",\"width\":800,\"height\":600},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/temporary-construction-roads-for-remote-oilfield-projects-training\\\/#mainImage\"},\"datePublished\":\"2019-02-10T15:32:27+00:00\",\"dateModified\":\"2026-09-20T04:54:54+00:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#website\",\"url\":\"https:\\\/\\\/develop.co.id\\\/training\\\/\",\"name\":\"DEVELOP\",\"description\":\"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist\",\"inLanguage\":\"en-US\",\"publisher\":{\"@id\":\"https:\\\/\\\/develop.co.id\\\/training\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO -->\n\n","aioseo_head_json":{"title":"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP","description":"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.","canonical_url":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/","robots":"max-image-preview:large","keywords":"","webmasterTools":{"miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#blogposting","name":"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP","headline":"Temporary Construction Roads for Remote Oilfield Projects Training","author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/09\/temporary-construction-roads-for-remote-oilfield-projects-training_13312_e5739.png","width":800,"height":600},"datePublished":"2019-02-10T15:32:27+00:00","dateModified":"2026-09-20T04:54:54+00:00","inLanguage":"en-US","mainEntityOfPage":{"@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#webpage"},"isPartOf":{"@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#webpage"},"articleSection":"Civil Engineering, Structure Maintenance &amp; Operation, Civil, construction road maintenance, geogrid road reinforcement, heavy construction traffic, oilfield access engineering, oilfield haul road design, remote construction access, remote site road construction, temporary drainage roads, temporary oilfield roads, temporary pavement engineering"},{"@type":"BreadcrumbList","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","position":1,"name":"Home","item":"https:\/\/develop.co.id\/training\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","position":2,"name":"Engineering &amp; Technical","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/civil-engineering\/#listItem","name":"Civil Engineering"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/civil-engineering\/#listItem","position":3,"name":"Civil Engineering","item":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/civil-engineering\/","nextItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#listItem","name":"Temporary Construction Roads for Remote Oilfield Projects Training"},"previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/#listItem","name":"Engineering &amp; Technical"}},{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#listItem","position":4,"name":"Temporary Construction Roads for Remote Oilfield Projects Training","previousItem":{"@type":"ListItem","@id":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/civil-engineering\/#listItem","name":"Civil Engineering"}}]},{"@type":"Organization","@id":"https:\/\/develop.co.id\/training\/#organization","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","url":"https:\/\/develop.co.id\/training\/","logo":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#organizationLogo","width":300,"height":150},"image":{"@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#organizationLogo"}},{"@type":"Person","@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author","url":"https:\/\/develop.co.id\/training\/author\/developtraining\/","image":{"@type":"ImageObject","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/6b88ccabac9c627e76fb131519cdc3ef0e725eb1ff178c0eaa169a92fc8becc5?s=96&d=mm&r=g","width":96,"height":96}},{"@type":"WebPage","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#webpage","url":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/","name":"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP","description":"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.","inLanguage":"en-US","isPartOf":{"@id":"https:\/\/develop.co.id\/training\/#website"},"breadcrumb":{"@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#breadcrumblist"},"author":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"creator":{"@id":"https:\/\/develop.co.id\/training\/author\/developtraining\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/09\/temporary-construction-roads-for-remote-oilfield-projects-training_13312_e5739.png","@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#mainImage","width":800,"height":600},"primaryImageOfPage":{"@id":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/#mainImage"},"datePublished":"2019-02-10T15:32:27+00:00","dateModified":"2026-09-20T04:54:54+00:00"},{"@type":"WebSite","@id":"https:\/\/develop.co.id\/training\/#website","url":"https:\/\/develop.co.id\/training\/","name":"DEVELOP","description":"Oil Gas,Petrochemical, Power Plant,Mining&Industrial Training Specialist","inLanguage":"en-US","publisher":{"@id":"https:\/\/develop.co.id\/training\/#organization"}}]},"og:locale":"en_US","og:site_name":"DEVELOP - Oil Gas,Petrochemical, Power Plant,Mining&amp;Industrial Training Specialist","og:type":"article","og:title":"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP","og:description":"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.","og:url":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/","og:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","og:image:secure_url":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png","article:published_time":"2019-02-10T15:32:27+00:00","article:modified_time":"2026-09-20T04:54:54+00:00","twitter:card":"summary_large_image","twitter:title":"Temporary Construction Roads for Remote Oilfield Projects Training - DEVELOP","twitter:description":"Pelajari teknik desain jalan konstruksi sementara untuk proyek lapangan minyak terpencil, mencakup beban berat, tanah dasar, perkerasan, drainase, dan penguatan.","twitter:image":"https:\/\/develop.co.id\/training\/wp-content\/uploads\/2026\/07\/DEVELOP-Logo-ls4-300x150-1.png"},"aioseo_meta_data":{"post_id":"13312","title":null,"description":null,"keywords":null,"keyphrases":{"focus":[],"additional":[]},"primary_term":null,"canonical_url":null,"og_title":null,"og_description":null,"og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":null,"og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":true,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":null,"twitter_description":null,"schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":null,"robots_max_videopreview":null,"robots_max_imagepreview":"large","priority":null,"frequency":null,"local_seo":null,"limit_modified_date":false,"ai":null,"breadcrumb_settings":null,"seo_analyzer_scan_date":null,"created":"2026-09-20 04:53:57","updated":"2026-09-20 06:49:08","focus_keyword":null,"additional_keywords":null,"truseo_locale":null},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/\" title=\"Home\">Home<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/\" title=\"Engineering &amp; Technical\">Engineering &amp; Technical<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\t<a href=\"https:\/\/develop.co.id\/training\/category\/engineering-technical\/civil-engineering\/\" title=\"Civil Engineering\">Civil Engineering<\/a>\n\t\t<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t\t\tTemporary Construction Roads for Remote Oilfield Projects Training\n\t\t<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/develop.co.id\/training\/"},{"label":"Engineering &amp; Technical","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/"},{"label":"Civil Engineering","link":"https:\/\/develop.co.id\/training\/category\/engineering-technical\/civil-engineering\/"},{"label":"Temporary Construction Roads for Remote Oilfield Projects Training","link":"https:\/\/develop.co.id\/training\/temporary-construction-roads-for-remote-oilfield-projects-training\/"}],"_links":{"self":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/13312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/comments?post=13312"}],"version-history":[{"count":0,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/posts\/13312\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media\/14308"}],"wp:attachment":[{"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/media?parent=13312"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/categories?post=13312"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/develop.co.id\/training\/wp-json\/wp\/v2\/tags?post=13312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}