DEVELOP Training Center menyelenggarakan Kelas Transformer Failure Root Cause Investigation for Process Plants yang sangat berguna untuk mendapatkan pengetahuan tentang investigasi akar penyebab kegagalan transformator di pabrik proses, mencakup bukti gangguan, riwayat operasi, hasil pengujian, kondisi fisik, mekanisme kerusakan, dan tindakan koreksi.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Transformer failure investigation scope for process plants
- Transformer construction and major failure-prone components
- Electrical, thermal, mechanical, and insulation failure mechanisms
- Transformer fault event reconstruction
- Operating history and loading condition review
- Protection relay records and trip event information
- Transformer oil condition and dissolved gas indicators
- Winding and bushing failure characteristics
- Cooling system faults and thermal stress
- Tap changer failure mechanisms
- Physical evidence preservation after transformer failure
- Case Study
Sesi 3-4
- Post-failure transformer inspection planning
- Review of electrical test results before and after failure
- Insulation resistance and winding resistance findings
- Transformer ratio and excitation test findings
- Oil test and dissolved gas result correlation
- Bushing inspection and failure evidence assessment
- Tap changer condition and contact examination
- Cooling system inspection and thermal evidence
- Protection operation and fault current assessment
- Failure mechanism reconstruction from collected evidence
- Root cause validation and corrective action development
- Transformer failure investigation report preparation
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.