DEVELOP Training Center menyelenggarakan Kelas Storage Tank Precommissioning and Commissioning yang sangat berguna untuk mendapatkan pengetahuan tentang precommissioning storage tank, pemeriksaan shell, roof, nozzle, foundation, internal cleanliness, piping, instrumentasi, water filling test, leak inspection, dan commissioning.
Pelatihan dilaksanakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta pelatihan didorong untuk berperan aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Storage tank construction and major components
- Shell, roof, bottom plate, nozzle, manway, and support inspection
- Internal cleanliness and foreign material verification
- Foundation, settlement, and structural condition checks
- Tank piping, valves, drains, vents, and overflow connections
- Level, pressure, temperature, and instrumentation checks
- Fire protection and tank safety equipment inspection
- Precommissioning inspection and test records
- Case Study
Sesi 3-4
- Storage tank commissioning sequence and filling preparation
- Water filling test and leak inspection
- Settlement monitoring and tank condition verification
- Level measurement and alarm function checks
- Inlet, outlet, drain, and overflow flow verification
- Tank cleaning, drying, and preparation for product service
- Final commissioning records and tank acceptance
- Case Study
Sejalan dengan teori yang disampaikan, sebanyak mungkin akan disertakan contoh-contoh studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk mengajukan pertanyaan dan mendiskusikan topik-topik yang dibahas.
