DEVELOP Training Center menyelenggarakan Kelas Steam Turbine Precommissioning and Commissioning yang sangat berguna untuk mendapatkan pengetahuan tentang precommissioning steam turbine, pemeriksaan rotor dan bearing, shaft alignment, lubrication, steam line preparation, commissioning, monitoring parameter, serta pengujian trip dan shutdown.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Steam turbine construction and major operating components
- Turbine casing, rotor, bearings, seals, and coupling inspection
- Installation condition and shaft alignment verification
- Lubrication and hydraulic control system checks
- Steam piping cleanliness and line preparation
- Drain, gland steam, condenser, and auxiliary system checks
- Valve position and steam supply verification
- Pre-start inspection and commissioning documentation
- Case Study
Sesi 3-4
- Steam turbine commissioning sequence
- Controlled steam admission and turbine rolling
- Speed, vibration, temperature, and pressure monitoring
- Bearing and lubrication condition monitoring
- Gland seal and condenser performance checks
- Trip, overspeed, and emergency shutdown verification
- Post-commissioning inspection and operational records
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.