DEVELOP Training Center menyelenggarakan Kelas Piping Preservation for Extended Construction Delays yang sangat berguna untuk mendapatkan pengetahuan tentang preservasi sistem perpipaan selama penundaan konstruksi berkepanjangan, pengendalian korosi, perlindungan komponen, pemeriksaan kondisi, serta pemulihan sistem sebelum commissioning.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Piping preservation objectives during extended construction delays and project phases
- Environmental exposure factors affecting piping condition during extended idle periods
- Material characteristics of carbon steel, stainless steel, and alloy piping systems
- Corrosion mechanisms affecting exposed piping during prolonged construction delays
- Moisture ingress pathways in piping, valves, flanges, and connected components
- External surface protection for piping stored within construction areas
- Internal preservation requirements for open and partially completed piping systems
- Temporary sealing methods for pipe ends, nozzles, vents, and drains
- Preservative selection based on piping materials and environmental conditions
- Inspection points for preserved piping during extended project suspension
- Preservation records, identification tags, and condition tracking requirements
- Case Study
Sesi 3-4
- Dry preservation methods for piping systems exposed to humid environments
- Wet preservation methods using suitable corrosion-inhibiting fluids
- Nitrogen blanketing requirements for selected piping and process systems
- Desiccant application for enclosed piping and moisture-sensitive components
- Flushing, draining, and drying requirements before extended preservation periods
- Valve preservation for actuated, manual, and control valve assemblies
- Flange face, gasket, and bolting protection during prolonged construction delays
- Inspection frequency and condition checks for preserved piping systems
- Preservation renewal requirements after environmental exposure or inspection findings
- Reinstatement of piping after extended preservation and pre-commissioning checks
- Preservation records, release criteria, and handover documentation
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.
