DEVELOP Training Center menyelenggarakan Kelas Piping Material Traceability for Critical Process Services yang sangat berguna untuk mendapatkan pengetahuan tentang ketertelusuran material perpipaan untuk layanan proses kritis, verifikasi sertifikat, identifikasi heat number, pemisahan material, dan rekaman pemasangan.
Pelatihan dilaksanakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta pelatihan didorong untuk berperan aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Material traceability requirements for critical process piping services
- Piping material specifications, grades, classes, and service classifications
- Material certificates and verification of heat number information
- Identification methods for pipes, fittings, flanges, valves, and components
- Material receiving inspection and documentation reconciliation
- Heat number transfer during pipe cutting and spool fabrication
- Traceability controls for fittings and small-bore piping components
- Segregation requirements for different material grades and specifications
- Marking methods for preserving identification after fabrication processes
- Material traceability during welding and joint fabrication
- Traceability records linking materials to spool and weld identification
- Case Study
Sesi 3-4
- Positive material identification requirements for selected critical services
- Material substitution review and documentation requirements
- Traceability risks caused by uncontrolled material movement
- Field installation traceability for prefabricated piping spools
- Traceability controls for repairs, replacements, and field modifications
- Linking material records with inspection and test documentation
- Electronic and physical registers for piping material identification
- Traceability audits for critical piping systems and components
- Missing certificate and unidentified material resolution processes
- Turnover dossier requirements for material traceability records
- Final traceability verification before testing and commissioning release
- Case Study
Sejalan dengan teori yang disampaikan, sebanyak mungkin akan disertakan contoh-contoh studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk mengajukan pertanyaan dan mendiskusikan topik-topik yang dibahas.
