DEVELOP Training Center menyelenggarakan Kelas Heavy Lift Planning for Offshore Module Installation yang sangat berguna untuk mendapatkan pengetahuan tentang perencanaan heavy lift instalasi modul offshore, kebutuhan pengangkatan, kapasitas crane dan vessel, koordinasi maritim, urutan operasi, serta pengendalian risiko pengangkatan.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Heavy lift planning for offshore module installation
- Module weight, center of gravity, and lift point requirements
- Lift study inputs and engineering information requirements
- Offshore crane capacity and operating envelopes
- Heavy lift vessel selection and interface requirements
- Lifting equipment selection and certification records
- Sling, spreader beam, and rigging configuration
- Lift path definition and installation sequence
- Module transport and vessel positioning interfaces
- Weather limitations and offshore operating conditions
- Lift team responsibilities and communication arrangements
- Case Study
Sesi 3-4
- Detailed heavy lift method planning and sequencing
- Crane load charts and lifting capacity verification
- Dynamic effects and offshore lift condition assessment
- Seafastening and module transport requirements
- Vessel stability and ballast coordination
- Rigging inspection and pre-lift verification
- Installation tolerances and landing requirements
- Simultaneous marine and lifting operations coordination
- Lift readiness review and hold-point requirements
- Weather monitoring and lift window assessment
- Emergency response arrangements for heavy lift operations
- Post-lift inspection and installation records
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.
