DEVELOP Training Center menyelenggarakan Kelas Frequency Protection Commissioning for Generator Systems yang sangat berguna untuk mendapatkan pengetahuan tentang commissioning proteksi frekuensi sistem generator, mencakup underfrequency, overfrequency, pickup, frequency ramp, waktu operasi, trip output, load shedding, dan verifikasi fungsi.
Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Generator frequency protection architecture
- Voltage and frequency input circuit verification
- Underfrequency and overfrequency characteristics
- Frequency pickup threshold settings
- Frequency ramp response characteristics
- Operating time and delay settings
- Load-shedding output circuits
- Trip and alarm interface verification
- Case Study
Sesi 3-4
- Frequency protection commissioning sequence
- Underfrequency injection testing
- Overfrequency injection testing
- Frequency ramp measurement
- Operating time verification
- Trip and load-shedding output testing
- Event record and commissioning result review
- Case Study
Sejalan dengan teori yang disampaikan,sebanyak mungkin akan diberikan contoh-contoh studi kasus yang relevan dengan kondisi yang ada diindustri. Dalam hal ini peserta diberikan kesempatan untuk bertanya dan mendiskusikan topik-topik yang dibahas.