DEVELOP Training Center menyelenggarakan Kelas Emergency Shutdown Logic Testing for Commissioning yang sangat berguna untuk mendapatkan pengetahuan tentang testing emergency shutdown logic, pemeriksaan input-output trip, shutdown sequence, logic solver, valve response, alarm, reset, bypass, discrepancy, dan dokumentasi commissioning.
Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Emergency shutdown logic architecture
- ESD input and output signal identification
- Shutdown matrix and cause-and-effect review
- Logic solver configuration and interface checks
- Trip setpoint and voting arrangement verification
- Shutdown valve and final element interfaces
- Alarm, indication, reset, and bypass functions
- ESD logic test records and documentation
- Case Study
Sesi 3-4
- Emergency shutdown logic test sequence
- Trip input activation and logic response
- Shutdown output and valve response checks
- Control room alarm and indication verification
- Reset and restart permissive testing
- Logic discrepancy identification and correction
- Final ESD logic records and commissioning release
- Case Study
Sejalan dengan teori yang disampaikan,sebanyak mungkin akan diberikan contoh-contoh studi kasus yang relevan dengan kondisi yang ada diindustri. Dalam hal ini peserta diberikan kesempatan untuk bertanya dan mendiskusikan topik-topik yang dibahas.
