DEVELOP Training Center menyelenggarakan Kelas Earth-Fault Relay Testing with 50N/51N Functions yang sangat berguna untuk mendapatkan pengetahuan tentang pengujian fungsi earth-fault 50N/51N, mencakup residual current, pickup, instantaneous, inverse-time, operating time, trip output, secondary injection, dan verifikasi hasil.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- 50N/51N earth-fault relay function architecture
- Residual current measurement and test connections
- 50N instantaneous earth-fault characteristics
- 51N inverse-time earth-fault curves
- Earth-fault pickup current measurement
- Operating time and time multiplier characteristics
- Residual current injection arrangements
- Trip output and earth-fault indication verification
- Case Study
Sesi 3-4
- 50N secondary injection testing
- 51N operating time measurement
- Multiple residual current test points
- Pickup threshold and timing comparison
- Binary output and trip contact verification
- Relay event and earth-fault record review
- Test result evaluation and documentation
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.
