DEVELOP Training Center menyelenggarakan Kelas Cooling Tower Precommissioning and Start-up Preparation yang sangat berguna untuk mendapatkan pengetahuan tentang precommissioning cooling tower, pemeriksaan fill, basin, fan, gearbox, water distribution, cleaning, circulation, start-up, serta pemantauan airflow dan cooling performance.
Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Cooling tower construction and major components
- Fill, drift eliminator, basin, fan, and distribution system inspection
- Structural condition and equipment installation checks
- Fan, gearbox, motor, coupling, and bearing inspection
- Water basin cleaning and internal cleanliness verification
- Water distribution piping, nozzles, and valve checks
- Make-up, blowdown, chemical dosing, and circulation system checks
- Pre-start inspection and commissioning documentation
- Case Study
Sesi 3-4
- Cooling tower start-up sequence and water circulation
- Fan rotation, vibration, speed, and motor current monitoring
- Water flow distribution and basin level verification
- Gearbox temperature and lubrication condition checks
- Cooling performance and temperature approach monitoring
- Abnormal vibration, leakage, and airflow identification
- Post-start inspection and commissioning acceptance
- Case Study
Sejalan dengan teori yang disampaikan,sebanyak mungkin akan diberikan contoh-contoh studi kasus yang relevan dengan kondisi yang ada diindustri. Dalam hal ini peserta diberikan kesempatan untuk bertanya dan mendiskusikan topik-topik yang dibahas.