DEVELOP Training Center menyelenggarakan Kelas Busbar Trunking System Installation yang sangat berguna untuk mendapatkan pengetahuan tentang pemasangan busbar trunking, tap-off unit, sambungan, penyangga, ekspansi, pembumian, pengujian isolasi, dan pemeriksaan sistem.
Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Busbar trunking construction, components, and rated capacities
- Sandwich and air-insulated trunking system configurations
- Trunking enclosure, conductor, and insulation arrangements
- Horizontal and vertical busbar trunking installation layouts
- Feeder unit and end-feed connection configurations
- Tap-off unit construction and connection requirements
- Busbar trunking support spacing and mounting systems
- Joint pack installation and connection preparation
- Phase identification and conductor orientation
- Fire barrier requirements for building penetrations
- Trunking route planning for electrical distribution systems
- Case Study
Sesi 3-4
- Busbar trunking joint assembly and torque verification
- Tap-off box installation and circuit connection
- Flanged connection between trunking and switchboards
- Expansion joint installation for long trunking routes
- Vertical riser installation and mechanical support
- Earthing and bonding of trunking enclosures
- Insulation resistance testing of trunking systems
- Continuity testing across trunking joints
- Phase sequence and polarity verification
- Visual inspection of joints, supports, and enclosures
- Pre-energization inspection of complete trunking routes
- Preparation of installation and test documentation
- Case Study
Sejalan dengan teori yang disampaikan,sebanyak mungkin akan diberikan contoh-contoh studi kasus yang relevan dengan kondisi yang ada diindustri. Dalam hal ini peserta diberikan kesempatan untuk bertanya dan mendiskusikan topik-topik yang dibahas.