DEVELOP Training Center menyelenggarakan Kelas Shutdown System Testing and Start-up yang sangat berguna untuk mendapatkan pengetahuan tentang testing shutdown system, pemeriksaan trip signal, logic, shutdown valve, cause-and-effect, reset, permissive, alarm, final element, serta persiapan start-up plant.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Plant shutdown system architecture and functions
- Shutdown input devices and signal interfaces
- Logic solver, trip matrix, and cause-and-effect review
- Shutdown valves and final element inspection
- Trip setpoints and shutdown signal verification
- Reset, permissive, bypass, and indication checks
- Control room and field interface verification
- Shutdown test records and start-up documentation
- Case Study
Sesi 3-4
- Shutdown system functional testing sequence
- Input stimulation and trip response verification
- Final element response and valve closure checks
- Alarm and control room indication testing
- Reset and restart permissive verification
- Fault identification and corrective testing
- Final shutdown test records and start-up release
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.