DEVELOP Training Center menyelenggarakan Kelas Turnover Package Quality for Oil and Gas Projects yang sangat berguna untuk mendapatkan pengetahuan tentang mutu paket turnover proyek minyak dan gas, penyusunan rekaman penyelesaian, dokumen inspeksi, sertifikat, punch item, batas sistem, serta dokumen penerimaan.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Turnover package structure for oil and gas projects
- System and subsystem boundary definition for turnover
- Turnover package content and acceptance requirements
- Construction completion records and supporting documents
- Inspection and test records for completed systems
- Material certificates and equipment documentation
- Welding records and nondestructive examination documentation
- Pressure testing and reinstatement records
- Electrical and instrumentation completion documentation
- Punch list records and outstanding item status
- Document indexing and package traceability requirements
- Case Study
Sesi 3-4
- Turnover package document verification and reconciliation
- Quality checks for incomplete or inconsistent records
- System handover dossiers and acceptance certificates
- Redline drawings and final field information
- Equipment preservation and installation records
- Commissioning prerequisites within turnover packages
- Document review comments and correction tracking
- Package status reporting and submission control
- Turnover package backlog reduction and prioritization
- Interface between construction, commissioning, and operations
- Final dossier compilation and archival requirements
- Turnover acceptance and package closeout
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.
