DEVELOP Training Center menyelenggarakan Kelas Structural Load Path Verification for Heavy Equipment Replacement yang sangat berguna untuk mendapatkan pengetahuan tentang verifikasi jalur beban struktur saat penggantian peralatan berat, mencakup berat, lifting, support sementara, elemen, sambungan, fondasi, anchor, dan penguatan.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Structural load path verification for heavy equipment replacement
- Existing equipment support configuration and load transfer
- Replacement equipment weight and center of gravity
- Operating, maintenance, and temporary lifting loads
- Heavy equipment removal load conditions
- Temporary lifting points and support arrangements
- Load transfer through beams, columns, and foundations
- Existing structural drawings and field verification
- Equipment skid and foundation interface conditions
- Crane and lifting reaction effects on structures
- Structural condition and deterioration assessment
- Case Study
Sesi 3-4
- Member capacity under replacement equipment loads
- Temporary load path during equipment removal
- Temporary support frame capacity assessment
- Beam and column reaction changes
- Connection capacity under lifting and operating loads
- Foundation reaction and anchor load verification
- Local reinforcement around lifting points
- Equipment installation sequence and structural stability
- Load redistribution after equipment replacement
- Structural strengthening for increased equipment weight
- Field verification during removal and installation
- Preparation of load path verification calculations and drawings
- Case Study