DEVELOP Training Center menyelenggarakan Kelas Settlement Risk Assessment for Long Pipeline Facilities yang sangat berguna untuk mendapatkan pengetahuan tentang penilaian risiko settlement pada fasilitas pipa panjang, mencakup kondisi tanah, settlement diferensial, pergerakan pipa, crossing, monitoring, perbaikan tanah, dan mitigasi.
Pelatihan dilaksanakan melalui penyampaian materi dan diskusi interaktif di dalam kelas. Peserta pelatihan diajak untuk sepenuhnya aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Settlement assessment requirements for long pipeline facilities
- Pipeline alignment and ground condition characterization
- Soil profiles along extended pipeline corridors
- Compressible soil and consolidation settlement mechanisms
- Groundwater conditions and seasonal soil movement
- Pipeline burial depth and soil cover effects
- Longitudinal settlement and pipeline deformation
- Differential settlement at soil transition zones
- Settlement near crossings and facility tie-in points
- Embankment and backfill settlement effects
- Geotechnical survey and ground investigation requirements
- Case Study
Sesi 3-4
- Settlement prediction along pipeline alignment
- Pipeline strain response to ground movement
- Settlement at river, road, and infrastructure crossings
- Ground improvement for settlement-prone sections
- Excavation and backfill quality control
- Pipe support and bedding requirements
- Settlement monitoring points and survey methods
- Remote monitoring for long pipeline corridors
- Threshold criteria for additional field assessment
- Mitigation through soil replacement and reinforcement
- Repair considerations for excessive pipeline movement
- Preparation of settlement risk registers and technical records
- Case Study
Materi teori akan dilengkapi dengan berbagai contoh studi kasus yang relevan dengan kondisi aktual di industri. Peserta diberikan kesempatan untuk bertanya dan berdiskusi secara mendalam mengenai topik-topik yang dibahas.
