DEVELOP Training Center menyelenggarakan Kelas Civil Interface Control for Modular Oil and Gas Facilities yang sangat berguna untuk mendapatkan pengetahuan tentang pengendalian interface sipil fasilitas minyak dan gas modular, mencakup fondasi, support modul, elevasi, anchor bolt, toleransi, survey, benturan desain, dan instalasi.
Pelatihan diselenggarakan melalui pemaparan materi dan diskusi interaktif di dalam kelas. Peserta didorong untuk berpartisipasi aktif dalam memahami materi yang disampaikan oleh instruktur.

Sesi 1-2
- Civil interface requirements for modular oil and gas facilities
- Module configuration and foundation interface arrangements
- Module support points and foundation load transfer
- Structural steel and concrete interface requirements
- Module dimensions, elevations, and connection tolerances
- Equipment support interfaces within modular units
- Pipe rack and module connection locations
- Access platform, stairway, and walkway interfaces
- Drainage and floor elevation coordination
- Embedded items and anchor bolt interface requirements
- Civil interface register and drawing coordination
- Case Study
Sesi 3-4
- Module transportation and temporary support conditions
- Foundation settlement limits for module installation
- Module lifting point and temporary support coordination
- Dimensional survey and reference control systems
- Construction tolerance allocation between disciplines
- Interface clashes between civil, structural, mechanical, and piping systems
- Foundation modification requirements for module installation
- Grouting and bearing interface requirements
- Site installation sequence and access constraints
- Field verification of module support locations
- Interface change tracking and document control
- As-built interface verification and handover
- Case Study
Sejalan dengan teori yang disampaikan, akan disertakan sebanyak mungkin studi kasus yang relevan dengan kondisi industri saat ini. Peserta juga diberikan kesempatan untuk bertanya dan berdiskusi terkait topik yang dibahas.
